Similar Projects
Misc. Electrical and Lighting
Bidding
Brighton, Denver, CO 80216

Bhs Stadium Lighting Contractor Services
Post-Bid
Brighton, CO 80601

Generators
Post-Bid
Aurora, CO 80011

Playground Lights
Results
$150,000 to $200,000 est. value
Brighton, CO 80601

Electrician Services
Term Contract
Results
Thornton, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Zone 3 Booster Pump Station Electrical Upgrades Project, Phase 2
Results
Aurora, CO

Recapitalization of Utilities (Recap 3)
Post-Bid
$250,000,000 to $500,000,000 est. value
Aurora, CO

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Audio, Staging and Lighting Services as Required for Aurora 2020 Signature Events
Term Contract
Post-Bid
Aurora, CO 80012

UPS Battery Removal and Replacement
Term Contract
Results
Northglenn, CO 80241

300kva Three-Phase Pad-Mounted Transformer
Post-Bid
Aurora, CO 80045

I-76 Luminaire Rewiring Project
Term Contract
Results
$400,000 to $500,000 est. value
Brighton, CO 80601

CU Denver Building Add Domestic Water Pump
Post-Bid
$250,000 to $300,000 est. value
Aurora, CO 80045

On-Call Emergency Generator/Transfer Switch Maintenance and Rental
Results
Brighton, CO 80601

Reported 03/19/2020 12:00 AM
Project Title

Recapitalization of Utilities Load Centers & UPS EE-FF-GG

Physical Address View project details and contacts
City, State (County) Aurora, CO 80017   (Adams County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The contract will include the construction of Load Centers and Un-interruptible Power Supply line-ups EE, FF, and GG, located on Buckley Air Force Base, Colorado. The work includes, but is not limited to the restoration, replacement and reconfiguration of active and non-active Critical Uninterruptable Power Supply Systems (UPS), (Technical) Load Centers and incidental related work consisting of the installation of all associated switchgear, batteries, and electrical infrastructure to support system redundancy inclusive of all Power Distribution Units (PDU); Motor Control Centers with Automation Systems, Human Machine Interfaces, Network Controls and planning and sequencing work to minimize power outages. This contract will also require the construction contractor to utilize a Temporary Load Center which will be Government Furnished Equipment (GFE), a trailer mounted load center, uninterruptable power supply, associated switchgear, batteries, and additional electrical infrastructure.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents