Similar Projects
Coastal Seafood
New Construction, Addition - 8,270 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Woolford, MD 21677

Seagirt Marine Terminal
Conception
$32,800,000 est. value
Baltimore, MD

Historic Fishing Facility And Waterman Docking Area
Renovation
Design
Royal Oak, MD 21662

Main Deck Replacement at ELMS Environmental Educational Center
Post-Bid
Less than $49,999 est. value
Lexington Park, MD 20653

Reef Construction/Sanctuary Restoration
Term Contract
Post-Bid
Annapolis, MD 21401

Replace an Existing Concrete Boat Ramp and Pier with New Flankwalls and Floating Dock at the Caroline County Boat Ramp
Results
Preston, MD 21655

Improvements to Waterman's Dock Dingy/Kayak/Canoe Dock and Dredging at West Chew Avenue
Results
Saint Michaels, MD 21624

Four Seasons at Kent Island Phase II
New Construction - 26,566 SF
Construction
Centreville, Chester, MD 21619

Living Shoreline, Erosion Control, Kayak Launch And Stone Bulkhead & Improvements
Renovation
Pending Verification
Arnold, MD

Bulkhead, Piers, Pilings, and Boat Lifts
Renovation
Pending Verification
Annapolis, MD 21403

Adaptive Boating Center
New Construction - 2,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Annapolis, MD 21043

Removal of Derelict or Abandoned Boats in Choptank Marina
Post-Bid
Denton, MD

Mariner Point Park Canoe Launch
Results
Joppa, MD 21085

Bulkhead Replacement
Renovation
Pending Verification
Annapolis, MD

Replacement at Inspiration Lake
Results
Gaithersburg, MD 20878

Reported 04/29/2020 12:00 AM
Project Title

Request for Information (RFI) Impact Pile Driving

Physical Address View project details and contacts
City, State (County) Patuxent River, MD   (Saint Marys County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Impact Pile Driving: - A Hydraulic Impact Hammer and crane is required. Desired specifications for the hammer weight is over 8,000 lbs, with the ability to produce a minimum rated energy level of 47,000 ft-lb). - A crane is required to conduct the pile driving from shore side and not from a barge.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 10 - Specialties.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents