Similar Projects
Cedar City Pickleball Complex Project - 2022
New Construction, Infrastructure
Design
$600,000 CJ est. value
Cedar City, UT 84720

Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

CICWCD Test Well and Vandenberghe Well Projects
Infrastructure
Bidding
$2,000,000 CJ est. value
Cedar City, UT 84720

River Bottom Improvement Project Prequalification
Post-Bid

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

New Bingham Highway Detention Park
Results

Neck Fire Chaining
Results
Cedar City, UT

Snowshoe and Toboggan Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

Quichapa Well 6 Waterline Replacement Project
Infrastructure
Results
$700,000 est. value
Cedar City, UT

Forest and Falcon Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

Region 4 Culvert Program, Phase 10
Infrastructure
Results
$500,000 est. value
UT

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

DFCM Construction-Standard Low Bid-Old Iron Towns Site
Infrastructure
Results
$160,000 est. value
Cedar City, UT 84720

Last Updated 08/03/2022 06:36 AM
Project Title

Region 4 Culvert Program, Phase 10 Drainage

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84721   (Iron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

County: Iron This Is a Working P+t (Price + Time) Project Wage Rates: Apply Engineer's Estimate: Greater than $500K but less than or equal $1.5M Davis-Bacon Wage Rate is Non-Applicable. Project Location: Region 4 Culvert Program, Phase 10 The principal items of work are as follows (for all items of work see attachment): Drainage Pipe - 30 inch, Smooth, Leak-Resistant Traffic Control Drainage Pipe - 54 inch, Reinforced Concrete, Leak-Resistant The project is to be completed: to be determined by competitive bid. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UDOT - Region 4 Culvert Program, Phase 10 Drainage *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents