Similar Projects
Sugarloaf Xpress Park and Ride Lot Construction
Infrastructure
Bidding
GA

Peachtree Industrial Boulevard, SR 140 / Holcomb Bridge Road and Pond Road Pedestrian Improvement
Infrastructure
Bidding
GA

Col/Wynne Russell-West Johns Sidewalk
Post-Bid
Lilburn, GA

Bona Road Sidewalk Improvements
Post-Bid
Buford, GA 30518

West Jones Bridge Pedestrian Crossing
Results
Peachtree Corners, GA 30092

Downtown Norcross Compactor Enclosure Construction
Results
Norcross, GA 30071

East Jones Bridge Road Multi-Use Trail
Infrastructure
Bidding
Peachtree Corners, GA 30092

Dacula City Hall Ada Upgrades
Post-Bid
Dacula, GA 30019

SR13 Left Turn Lane Extension
Results
Less than $102,621 est. value
Buford, GA 30515

Paper Mill Road Sidewalk Improvements Project
Post-Bid
Lawrenceville, GA 30246

Clayton Street at Nash Street Parking Lot Project
Results
Less than $382,757 est. value
Lawrenceville, GA 30046

Robin Ridge Drive, Joey Court, and Tecca Court Asphalt Paving Improvements/Sidewalk Project
Post-Bid
Dacula, GA 30019

Multi-Purpose Trail Phase 1
Results
Less than $1,122,112 est. value
Snellville, GA 30039

Provision of Parking Lot and Asphalt Trail Maintenance and Repair on an Annual Contract
Term Contract, Infrastructure
Post-Bid
GA

Pleasant Hill Road (Peachtree Industrial Boulevard to Chattahoochee River) and Boardwalk at the Chattahoochee River Pedestrian Improvement Project
Results
Lawrenceville, GA 30042

Last Updated 10/26/2021 08:19 AM
Project Title

2021 CDBG Sidewalk Trip Hazard Removal

Physical Address View project details and contacts
City, State (County) Norcross, GA   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Services to completely remove tripping hazards from concrete sidewalk surfaces throughout designated areas to a height difference of 0” for the entire width of the sidewalk. The work is to be done by saw cutting. The level sidewalk slab must be left unmarked by repair equipment/method. The Contractor is to provide a minimum of three (3) complete and accurate account references for which the firm has provided precision sidewalk hazard reduction services (preferably local government, cities, and state accounts).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents