Similar Projects
Replace Two HVAC Systems located in Building 1001
Design
$1,000,000 to $5,000,000 est. value
Fort Hood, TX

Replace Chillers Building 56059
Design
$100,000 to $250,000 est. value
Fort Hood, TX 76544

4510--Cooling Tower Water Treatment Stations
Bidding
Temple, TX 76504

J--Fill and Fan Drive Belt Replacement
Post-Bid
Temple, TX 76504

Preventive Maintenance, Inspection, and Repair Services of Chilled Water Systems and Associated Equi
Post-Bid

41--50 Ton Daiken Chiller
Results
Killeen, TX 76544

Replace Two Chiller Circuites for a Building
Results
$250,000 to $500,000 est. value
Killeen, TX 76544

Facility Maintenance and Repair to Include HVAC, Electrical and Plumbing Services
Term Contract
Post-Bid

Central Fire Station HVAC Equipment
Results
Belton, TX 76513

Repair HVAC Bldg 90067 Gray Army Air Traffic Control Bldg.
Post-Bid
$250,000 to $500,000 est. value
Fort Hood, TX 76543

Installation of HVAC Systems in Selected Units at Autumn Leaves and Ratliff Homes
Results
Less than $113,000 est. value
Temple, TX 76501

HVAC
Post-Bid
$250,000 to $500,000 est. value
Fort Hood, TX 76544

Replace HVAC at Building
Results
$500,000 to $1,000,000 est. value
Fort Hood, TX 76544

Repair HVAC Bldg 91012
Post-Bid
$500,000 to $1,000,000 est. value
Fort Hood, TX

HVAC Maintenance & Repair Services
Results
Temple, TX 76501

Reported 07/27/2019 12:00 AM
Project Title

Replace HVAC System on the 2nd and 3rd Floor of Building 1001

Physical Address View project details and contacts
City, State (County) Fort Hood, TX   (Bell County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description This includes but is not limited to demolition and replacement of air handling units (AHU) 7 through 14 and return fans (RF) 7 through 14. There will also be minor replacement of ductwork, piping, valves, controls and electrical.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents