Similar Projects
River Bottom Improvement Project Prequalification
Post-Bid

Culinary Water Improvement Project on 300 West Street and 1600 North Street
Post-Bid
$250,920 est. value
Sunset, UT

Parks and Open Spaces Master Valves and Flow Meters
Results
Clearfield, UT 84015

200 East and Main Street Water Project
Results
Farmington, UT

Culinary Water Line Replacements
Post-Bid
$250,000 est. value
Bountiful, UT

Oakwood Drive Water Line Replacement
Results
$400,000 est. value
Layton, UT 84040

East Chase Lane To Parrish Lane - Culinary Waterline and Storm Drain
Post-Bid
$450,000 est. value
Centerville, UT 84014

Secondary Water Transmission Line and Street Reconstruction
Results
North Salt Lake, UT 84054

1500 South Waterline
Infrastructure
Post-Bid
Woods Cross, UT

Train Watch Park Prv Improvement Project
Alteration
Results
$94,500 est. value
Clearfield, UT

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

500 West Water and Sewer Line Construction Project
Infrastructure
Results
$427,114 est. value
Clearfield, UT 84015

Lacey Way Waterline and Street Reconstruction
Infrastructure
Post-Bid
North Salt Lake, UT 84054

2021 Water Line Projects
Infrastructure
Results
$1,765,214 est. value
Bountiful, UT

600/640 West Street and Culinary Water Reconstruction Project
Infrastructure
Post-Bid
West Bountiful, UT

Last Updated 07/06/2022 07:21 AM
Project Title

North Salt Lake (NSL) Wholesale Culinary and Raw Water Pipelines Replacement Project

Physical Address View project details and contacts
City, State (County) North Salt Lake, UT   (Davis County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $980,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Weber Basin Water Conservancy District is requesting Statements of Qualification (SOQs) from contractors for the construction of replacing an existing Culinary and Raw waterlines in North Salt Lake, Utah. The work will include but not limited to site work, installing a 3 new pipelines. This project includes installing approximately 880 feet of 10-inch, 6,550 feet of 12-inch, 5,620 feet of 18-inch C-900 PVC pipe and fittings, mainline valves, combination air-vacuum valves, and other culinary waterline appurtenances. The District provides culinary and raw water to industrial customers in North Salt Lake City through two existing pipelines that range from 10" to 18" diameters. A new alignment was chosen for the pipelines to best serve the customers. The new alignment (approximately 1 mile long) will run through or cross several different landowners and entities including, North Salt Lake City, UDOT, UTA, and Union Pacific Railroad.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents