Similar Projects
Holiday Inn / Flagstaff
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Flagstaff, AZ 86004

Babbitt Ranch Wind
New Construction, Infrastructure
Design
$39,500,000 CJ est. value
Williams, AZ 86046

Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Design
$98,000,000 CJ est. value
Williams, AZ 86046

Substance Abuse and Residential Facility
New Construction, Infrastructure - 6,000 SF
Bidding
$2,743,152 CJ est. value
Page, AZ 86040

RFP D/B - 4-plex, 48 Apartments
New Construction, Infrastructure
Bidding
$5,300,000 CJ est. value
Tuba City, AZ 86045

Flagstaff-Holbrook-Lupton Hwy (I-40) (I-40;Various Locations)
Infrastructure
Sub-Bidding
$916,000 CJ est. value
Flagstaff, AZ 86004

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Posse Ground Parking and Soldiers Pass SUP Improvements Project
Infrastructure
Post-Bid
$928,124 est. value
Sedona, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

Pefo Replace Water Tank Ladder
Results

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

2022 Bond - Flagstaff Unified School District
Demolition, New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Flagstaff, AZ 86001

Route 89 Self-Storage
New Construction, Infrastructure - 10,000 SF
Pending Verification
$2,000,000 CJ est. value
Flagstaff, AZ 86004

Flagstaff Elkwood Mixed-Use
New Construction, Infrastructure - 6,000 SF
Design
$84,000,000 CJ est. value
Flagstaff, AZ 86001

Install a Livestock Waterline Project
Infrastructure
Post-Bid
Page, AZ 86040

Last Updated 09/26/2022 08:04 AM
Project Title

Reclaimed Water Line Rehabilitation from South Rim WWTP to School

Physical Address View project details and contacts
City, State (County) Grand Canyon, AZ 86023   (Coconino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $4,794,613 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 23, 2022 Contract Award Number: 140P1522C0014 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: CNNLSHFN4KW8 Contractor Awarded Name: KWR CONSTRUCTION, INC. Contractor Awarded Address: , AZ 85635-8987 USA Base and All Options Value (Total Contract Value): $4794613 Project Title: Reclaimed Water Line Rehabilitation from South Rim WWTP to School, Grand Canyon National Park, AZ This solicitation is being solicited as a Total Small Business Set-Aside. NAICS Code - 237110 The construction magnitude for this work is between $1,000,000 and $5,000,000. A site visit has been scheduled for Wednesday July 13, 2022 at 11:00am local time. Please refer to Section L, Provision 52.236-27 for DETAILED instructions/requirements for the site visit. Block 13 below, requires submission of 1 electronic copy of your proposal. Please ensure company UEI (new identifier assigned by sam.gov to replace DUNS number) is annotated in Block 14. Pre-proposal questions shall be submitted a minimum of 7 days prior to the due date and time for proposals. Submit questions only though email to both of the following: Contracting Officer, Connie Gordon, connie_gordon@nps.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents