FM270 Public Boat Ramp Renovation - PK1804 - City of League City
Infrastructure
Conception
$920,000 CJ est. value
League City, TX 77573

Bay Area Boulevard 12" Sewer Improvements FM/LS - WW1702 - City of League City
Infrastructure
Conception
$2,159,643 CJ est. value
Friendswood, TX 77546

ReGen III USGC Refinery
New Construction, Infrastructure
Design
$293,000,000 CJ est. value
Texas City, TX 77590

Water, Sanitary Sewer, and Drainage Facilities to Serve Westland Ranch, Section 2 and Magnolia Bayou Drive
Infrastructure
Design
$600,000 CJ est. value
Texas City, TX 77590

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Dallas Salmon WWTP Operations Center
New Construction, Infrastructure - 10,000 SF
Bidding
$6,400,000 CJ est. value
League City, TX 77573

Underground Utilities to Serve Madrid Lane Phase 2 at Coastal Point
Infrastructure
Post-Bid
League City, TX 77573

Grading and Fill Rough Cut to serve Town Harbour Estates
Infrastructure
Post-Bid
League City, TX

36-Inch Water Transmission Main
Results
Less than $22,000,000 est. value
League City, TX

Water Meter Reading Services
Infrastructure
Results
Friendswood, TX

Dutch Bros #TX14901 / League City
New Construction, Infrastructure - 950 SF
Pending Verification
$750,000 CJ est. value
League City, TX 77573

League City Convenience Store
New Construction, Infrastructure - 12,000 SF
Pending Verification
$250,000 CJ est. value
League City, TX 77573

LCP and Walker Street Intersection Improvements - ST1913 - City of League City
Infrastructure
Conception
$2,103,434 CJ est. value
League City, TX 77573

Whataburger at Santa Fe
New Construction, Infrastructure - 3,746 SF
Design
$2,500,000 CJ est. value
Santa Fe, TX 77510

New City Hall Renovation and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Hitchcock, TX 77563

Last Updated 12/07/2022 03:35 PM
Project Title

2022 America Rescue Plan Act Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Texas City, TX 77590   (Galveston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,685,342 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 7 2022, project was awarded to Carter Construction, LLC, awarded amount is $3,685,341.50. The City of Texas City is requesting bids for the2022 America Rescue Plan Act DrainageImprovement Project. This project includes three project locations within the city limits of the City of Texas City. The individual projects are discussed below: Bay Street Bridge Extension This project location involves the reconstruction of a multiple barrel culvert bridge on BayStreet Extension crossing channel A-2. The reconstruction of the channel crossing will involve removal of eight (8) existing 130"x 90"corrugated arch metal culvert pipes and replacing them with six (6) 9' wide x 8' high reinforced concrete box culverts. This projectwill also include the replacement of the concrete headwalls and wing walls, as well as theasphalt roadway pavement within the project limits. Ditch 50A Stabilization This project location involves the erosion repairof the existing ditch 50A, including channel lining with riprap, 4" sealed slab, 8' and 5" slope paving, excavation, and ditch regrading. Loop 197 Ditch Lining This project location involves the concrete lining along the south road side ditch on Loop197 North (25th Avenue) between the sidewalk and the sound barrier wall. The location of theditch lining is east and west of 26th street northand between 19th Street North and 14th StreetNorth. These ditches will be regraded andlined with 5" concrete slope paving. Bids must be sealed marked "BID #2023- 420 2022 America Rescue Plan Act Drainage Improvement Project" It is the sole responsibility of the bidder to ensure that his bid is actually in the Purchasingoffice prior to the expiration of the time anddate above first written. Bid security in the amount of five (5) percentof the greatest amount bid must accompanyeach bid. It shall be each bidder's sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under whichthe work is to be done. It shall be understoodand agreed that all such factors have beenthoroughly investigated and considered in the preparation of the bid submitted. The Contractor and all Subcontractors for thisproject will be required to pay not less than theprevailing wage rates for the area of the project as required in the contract documents. Upon consideration of the proposals the CityCommission plans to award a Contract; however the Owner reserves the right to reject anyand all bids, to waive any and all formalitiesand technicalities, and to accept any bidwhich it deems advantageous to the owner.Each bidder agrees to waive any claim it hasor may have against the Owner, the Engineer,and their respective employees, arising out ofor in connection with the administration, evaluation or recommendation of any bid. Thesuccessful bidder will be required to furnish aperformance bond and payment bond in anamount of 100% of the total contract price.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents