Similar Projects
Reported | 05/19/2023 12:00 AM |
Project Title | RFP Construction Management Services- Northern Fish Hatchery Infrastructure Projects |
Physical Address | View project details and contacts |
City, State (County) | Lansing, MI 48933 (Ingham County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Northern Fish Hatchery Infrastructure Projects - Marquette State Fish Hatchery, 488 Cherry Creek Rd, Marquette, MI 49855 Thompson State Fish Hatchery, 944 S State Hwy M149, Manistique, MI 49854 Oden State Fish Hatchery, 8258 S Ayr Rd, Alanson, MI 49706 Projects will likely include fish feeder replacement (tentative); a new residential building (Thompson), roof repair and replacement; structural upgrades to various buildings and other structures; resurfacing of fish rearing raceways; upgrades to electrical distribution systems; production well maintenance; heating plant upgrades; asphalt upgrades and replacement; storm drain and culvert repair/replacement (Oden); and mechanical and ultraviolet filtration. See Attachment C DNR Prioritization List and Attachment D Aerial Exhibits Showing Location of Work at Each Hatchery. This questionnaire will be used by the Department of Technology, Management and Budget and an ad hoc advisory committee for the purpose of making an initial evaluation of architectural / engineering firms interested in providing architectural / engineering services for this project. The project will consist of providing a proposal for some or all of the following: Phase 100 Study 200 Program 300 Schematic Design 400 Preliminary Design 500 Final Design 600 Construction Administration - Office Services 700 Construction Administration - Field Services Not all phases may be initially awarded. Questions must be in writing and directed to Chris Parsons at parsonsc5@michigan.gov. Do not submit online questions via electronically. 01/19/23, 2:00 PM ET If needed, addenda will be posted on SIGMA. Estimated total project costs are $5M to $10M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Method of Contractor Selection has not been determined at this Time. NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Alan Goschka at goschkaa@michigan.gov no later than 2:00 p.m., Eastern on May 11, 2023. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |