Similar Projects
Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Parking Lot Resurfacing and Entry Drives / East Lansing Soccer Complex
Infrastructure
Conception
$325,000 CJ est. value
East Lansing, MI 48823

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

Hot Mix Asphalt Cold Milling and Resurfacing, Sidewalk Ramps and Pavement Markings on M-52
Infrastructure
Bidding
$294,000 CJ est. value
Stockbridge, MI 49285

Rehabilitation of Steam Manholes MH905 and MH910
Infrastructure
Bidding
$300,000 CJ est. value
Lansing, MI 48933

Wexford Montessori Site Improvements
Infrastructure
Post-Bid
Lansing, MI 48911

Sexton Site Work
Infrastructure
Post-Bid
Lansing, MI 48915

North Elementary Site Improvements
Infrastructure
Results
Lansing, MI 48911

2022 Bituminous Paving
Infrastructure
Results
Lansing, MI 48933

Neogen Shiawassee Street Manufacturing Plant
New Construction, Infrastructure - 175,000 SF
Pending Verification
$70,000,000 CJ est. value
Lansing, MI 48912

Meridian Company Industrial Building
New Construction, Infrastructure - 31,355 SF
Pending Verification
$16,000,000 CJ est. value
East Lansing, MI 48823

International Center - Renew/Replace Drain Piping System - Office - Michigan State University
Renovation, Infrastructure
Conception
$650,000 CJ est. value
East Lansing, MI 48824

City View Lansing Apartments
New Construction, Infrastructure - 3,500 SF
Design
$25,000,000 CJ est. value
Lansing, MI 48933

Cooper Street CF - Wi-Fi Cabling Infrastracture
Infrastructure
Bidding
$300,000 CJ est. value
Lansing, MI 48933

Reported 05/19/2023 12:00 AM
Project Title

RFP Construction Management Services- Northern Fish Hatchery Infrastructure Projects

Physical Address View project details and contacts
City, State (County) Lansing, MI 48933   (Ingham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Northern Fish Hatchery Infrastructure Projects - Marquette State Fish Hatchery, 488 Cherry Creek Rd, Marquette, MI 49855 Thompson State Fish Hatchery, 944 S State Hwy M149, Manistique, MI 49854 Oden State Fish Hatchery, 8258 S Ayr Rd, Alanson, MI 49706 Projects will likely include fish feeder replacement (tentative); a new residential building (Thompson), roof repair and replacement; structural upgrades to various buildings and other structures; resurfacing of fish rearing raceways; upgrades to electrical distribution systems; production well maintenance; heating plant upgrades; asphalt upgrades and replacement; storm drain and culvert repair/replacement (Oden); and mechanical and ultraviolet filtration. See Attachment C DNR Prioritization List and Attachment D Aerial Exhibits Showing Location of Work at Each Hatchery. This questionnaire will be used by the Department of Technology, Management and Budget and an ad hoc advisory committee for the purpose of making an initial evaluation of architectural / engineering firms interested in providing architectural / engineering services for this project. The project will consist of providing a proposal for some or all of the following: Phase 100 Study 200 Program 300 Schematic Design 400 Preliminary Design 500 Final Design 600 Construction Administration - Office Services 700 Construction Administration - Field Services Not all phases may be initially awarded. Questions must be in writing and directed to Chris Parsons at parsonsc5@michigan.gov. Do not submit online questions via electronically. 01/19/23, 2:00 PM ET If needed, addenda will be posted on SIGMA. Estimated total project costs are $5M to $10M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Method of Contractor Selection has not been determined at this Time. NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Alan Goschka at goschkaa@michigan.gov no later than 2:00 p.m., Eastern on May 11, 2023.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents