Similar Projects
Water Main Replacement
Design
Elmwood Park, IL

Fire Hydrants and Accessories
Post-Bid
Mount Prospect, IL

Lions Park Water Main Replacement
Post-Bid
Mount Prospect, IL

Replace Piping System and Renovate Washrooms
Results
Less than $150,000 est. value
Chicago, IL

Domestic Water Piping Replacement at Ridge Circle Elementary School
Results
Streamwood, IL 60107

Enterprise Park Avenue Water Main Improvements
Post-Bid
South Chicago Heights, IL

Municipal Center Valve Replacement
Results
Glenview, IL

2021 Water and Sewer Improvements
Post-Bid
Streamwood, IL

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Arbor Drive Water Main Improvements - Phase 3
Post-Bid
Rolling Meadows, IL

Lions Park Water Main Replacement
Results
Mount Prospect, IL 60056

Raw Water Intake Maintenance
Post-Bid
Winnetka, IL

Graymoor Force Main Lining
Results
Less than $832,000 est. value
Olympia Fields, IL

Purchase of Potable Water Meters
Post-Bid
Schaumburg, IL

Water Main Repair Clamps
Results
Buffalo Grove, IL

Reported 06/04/2022 12:00 AM
Project Title

Water Main Construction and Lead Service Line Replacement Pilot Project

Physical Address View project details and contacts
City, State (County) Chicago, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,001 to $5,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Description of Work: Work to be done under this Contract is described in the Project Information found on Book 2 of these specifications. B. Furnishing all Labor, Materials, Equipment, and Transportation Services: Contractor must furnish all labor, materials, proper equipment and machinery, and transportation services necessary to perform and complete, in a workmanlike manner and within the specified time, all Work required under this contract. If overtime or premium labor time is required to perform the Work and/or to comply with permit requirements, the Contractor is solely responsible for the additional labor costs. Additional labor costs shall not be passed onto the Commissioner. C. Project Site: Contractor must maintain the project site and Work area in a clean, orderly and safe manner. D. Coordination: Contractor must coordinate his Work with other contractors, agencies, and utilities as required or directed by the Commissioner. E. Protection of Work: Contractor must provide protection, repair and restoration of all finished Work or property damaged during construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents