Similar Projects
Page Hall Renovation
Renovation, Alteration - 30,000 SF
Design
Raleigh, NC 27695

Z2DA--Install Emergency Power for HVAC
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Durham, NC 27705

Gas Water Heater and HVAC Venting Replacements
Alteration
Post-Bid
Raleigh, NC 27604

Fan Coil Units
Alteration
Results
$149,640,350 est. value
Durham, NC

200 Ton Air Cooled Water Chiller
Alteration
Results
Raleigh, NC

Brogden Middle School - Boiler Replacement
Alteration
Post-Bid
Durham, NC 27704

DPS Burton Elementary School Boiler Replacement
Alteration
Results
$332,600 est. value
Durham, NC 27701

Air Filters
Alteration
Post-Bid
NC

Mechanical Equipment Replacement Group 5
Alteration
Results
Raleigh, NC

Forestry Sciences Laboratory, Research Triangle Park, NC / HVAC Preventive Maintenance
Term Contract
Post-Bid
Durham, NC 27709

Southwest Elementary School Boiler Replacement
Renovation
Results
$282,020 CJ est. value
Durham, NC 27713

HVAC 40 Ton Package Unit for General Services Warehouse
Alteration
Post-Bid
Durham, NC

Carrington Middle School Chiller Replacement
Renovation
Results
$697,000 CJ est. value
Durham, NC 27712

HVAC Replacements for County Annex
Alteration
Post-Bid
Raleigh, NC

Sherwood Githens Middle School Chiller Replacement
Renovation
Results
$376,900 CJ est. value
Durham, NC 27707

Last Updated 05/31/2023 02:37 AM
Project Title

Brogden Middle School Chiller & Controls

Physical Address View project details and contacts
City, State (County) Durham, NC 27704   (Durham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $627,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project no: NC12X002 All questions must be submitted via email no later than April 14, 2023, at 2pm Email: Dist.Purchasing@dpsnc.net No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days. Bid security required is 5% of the bid in cash, certified check, or Bid Bond. Performance and Payment Bonds for 100% of the contract amount will be required. Durham Public Schools reserves the right to reject any and all bids and to waive informalities or irregularities. Minority Business Participation: Bidders shall note that compliance with County of Durham MBE policies and the North Carolina Statute 143-128.2 (c) are required for this project. Project scope: The scope of this project is to replace existing system controllers, sensors, enclosures, and field devices. Existing actuators, free stats, valves, and relays are intended to remain. Any found not functional during checkout are to be captured on a deficiency report and replaced as needed. Integrate new equipment into the existing control system, previously installed, as per accompanying as-builts. There will be new Roof Top Units for the Existing Gym added All questions must be submitted via email no later than May 12, 2023, at 2pm Email: Dist.Purchasing@dpsnc.net

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents