Similar Projects
Speed Bump Installation
Post-Bid
Irvington, NJ 07111

Well 5 Retrofit
Post-Bid
Burlington, NJ 08016

Wastewater Treatment Plant Replacement of Influent Pumps
Results
Riverton, NJ 08077

Hyson Road Water Treatment Plant Recycle Pump Repair and Replacement
Results
Jackson, NJ 08527

Supply and Delivery of Aurura Pumps
Post-Bid
Camden, NJ

SWPCF Potable Water Improvements
Results
$268,000 est. value
West Creek, NJ 08721

Backflow Preventers Repair and Calibration
Post-Bid
Berkeley Heights, NJ 07922

Lower Manasquan Pump Station Pump Rehabilitation and Check Valve Replacements
Results
$356,711 est. value
Howell, NJ

Well Testing, Sampling and Analysis
Post-Bid
Galloway, NJ 08205

Well House #8 Construction and Extension of Electrical System in the Borough of Collingswood
Results
$515,555 est. value
Collingswood, NJ 08108

Well 11 Improvements
Post-Bid
Livingston, NJ

Furnish and Deliver One (1) Jet Mixing Pump as Manufactured by Sulzer or Equivalent
Results
Linden, NJ 07036

On-Call Service Contract for Wet Well Cleaning
Post-Bid
Clinton, NJ

Well Maintenance and Repairs
Term Contract
Results
Bridgeton, NJ 08302

Wet Well Cleaning On-Call Service Contract
Post-Bid
Clinton, NJ 08809

Last Updated 12/10/2019 11:00 AM
Project Title

Installation of Replacement Dewatered Sludge Pumps

Physical Address View project details and contacts
City, State (County) Bridgewater, NJ   (Somerset County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Municipal Agency - 05/24/19
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of Work shall include, but not be limited to, the replacement of two (2) dewatered sludge pumps inside the existing R1 and R2 Incinerator buildings with the Authority supplied pumps. Dewatered sludge pumps include the screw feeders, hydraulic power units, control panels and flow measuring system. Work shall also include the installation of two (2) Authority supplied sludge pipeline lubrication pump systems with associated lube rings. Contract Period - 07/22/2019 to 11/1/2019

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents