Similar Projects
West Apron Expansion - Phase II
Bidding
Oak Island, NC

Install Runway 23R ILS Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
NC

Runway 5R-23L Rehabilitation Project, Construction Phase 4
Post-Bid
Greensboro, NC 27409

Taxiway B Rehabilitation-Phase 2
Post-Bid
$10,000,000 to $20,000,000 est. value
Morrisville, NC 27560

Apron Rehabilitation (Areas A, B and Half of C)
Results
Less than $790,990 est. value
Monroe, NC

Parallel Taxiway Rehabilitation
Results
NC

Runway 4 Approach Clearing
Post-Bid
New Bern, NC 28562

Corporate Hangar Taxilane Rehabilitation Schedule I and Rehabilitate Fuel Farm Drive and Taxilane Schedule II
Results
Less than $743,576 est. value
Gastonia, NC 28056

Update Markings on Taxiway F
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Runway 18C/36C Joint Sealant Replacement, Spall Repairs and Taxiway Shoulder Repair
Results
Charlotte, NC

North Aircraft Apron Pavement Rehabilitation
Post-Bid
Currituck, NC

Runway 5R-23L Repairs
Results
Less than $598,895 est. value
Raleigh, NC 27623

Taxiways D and A1 Resurfacing
Post-Bid
Raleigh, NC

Taxiway Shoulder Pavement Rehabilitation Phase I
Results
Charlotte, NC 28202

Airport - Partial Parallel Taxiway and Apron Expansion
Post-Bid
$3,500,000 to $3,800,000 est. value
Jefferson, NC 28640

Last Updated 04/02/2020 09:39 AM
Project Title

West Ramp Expansion Phase II

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The West Ramp will be expanded to its ultimate configuration. This expansion will allow for new concrete pavement for aircraft loading. Drainage structures located within this pavement will be built to accommodate loads from aircraft and convey water from added pavement area. A jet fuel hydrant system will be built to provide fueling to the gate positions at the future concourse. This system will include extending a jet fuel system from an existing control valve vault. Additionally, Rental Car Road, from the exiting round-about on Old Dowd to the south, will be reconstructed with new geometrics and grades to accommodate a new prescreening area, Gate 80, and associated buildings and canopies (guardhouse and prescreening). A GSE facility will be constructed immediately to the north of the West Ramp Expansion. The GSE facility will include approximately 15,000 square yards of concrete pavement for vehicles, a fuel station for ground vehicles, a glycol storage tank and dispenser, and lavatory dump shelter with a wastewater grinder. This system will tie to existing sanitary sewer on Rental Car Road.

Details

Division 22 - Plumbing, Facility Storm Drainage.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents