Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

Stephenson-Taylor Water Line Extension
Infrastructure
Post-Bid
$250,000 CJ est. value
Binger, OK 73009

Waterline Replacement - Memorial Road and Lake Hefner Parkway
Infrastructure
Results
$875,000 est. value
Oklahoma City, OK

Hinton Waterline Extension
Infrastructure
Results
$325,000 est. value
Hinton, OK

Stilwell Public Schools Classroom Addition
Addition, Demolition, Infrastructure
Construction
$497,300 CJ est. value
Stilwell, OK 74960

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

Utilities - SH 152
Infrastructure
Design
$272,500 CJ est. value
Sayre, OK 73662

Pavement Rehabilitation (Asphalt) Indian Nation Turnpike
Infrastructure
Bidding
$7,963,144 CJ est. value
Stringtown, OK 74569

Utility Relocation Gate Valves
Infrastructure
Post-Bid

OKC Zoo Water Line Extension
Infrastructure
Results
$500,000 est. value
Oklahoma City, OK

Grade, Drain, Bridge and Surface - SH 8
Infrastructure
Design
$9,000,000 CJ est. value
Cherokee, OK 73728

Last Updated 02/14/2023 03:32 AM
Project Title

Utilities - SH 2

Physical Address View project details and contacts
City, State (County) Wilburton, OK 74578   (Latimer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,261,818 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-2: From 15.9 Mi North of the Pushmataha C/l, Ext North Approx 6.4 Mi Ut for 24403(04) As of February 14, 2023, the project is in Final Planning status. Anticipated letting month/year is January, 2023. Length : 6.400 Mi OKDOT - Utilities - SH 2 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents