Similar Projects
Reported | 04/27/2022 12:00 AM |
Project Title | Treated Water Pipeline Madison Service Line 2/3A |
Physical Address | View project details and contacts |
City, State (County) | Tea, SD 57064 (Lincoln, Minnehaha Counties) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $14,000,000 to $18,000,000 |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximately 81,300 linear feet of 16-inch diameter buried PVC or ductile iron pipe. Additionally, approximately 3,450 linear feet of pipe will be installed using horizontal directional drilling techniques. Approximately 830 linear feet of jacked or bored highway and railroad crossing casing pipe (24” diameter). Relocation and replacement of existing small diameter rural water lines and drain tile. Miscellaneous appurtenances including direct bury gate valves, manual air release valves, and blow-off assemblies. Temporary and permanent erosion control, fencing, reclamation and seeding. Corrosion protection system components including ground beds, rectifiers, galvanic anodes, and test stations. Components depend on type of pipe. Traffic control during construction. Pipeline pigging, flushing, hydrostatic pressure testing, and disinfection. And, Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |