Similar Projects
Last Updated | 09/21/2021 10:04 AM |
Project Title | SOF Special Tactics Operations Facility (23STS) FTEV103005 |
Physical Address | View project details and contacts |
City, State (County) | Hurlburt Field, FL 32544 (Okaloosa County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct facilities totaling 103,700sf with foundation and floor slab, structural framing, insulated walls, sloped roofs, environmental control, fire detection and suppression and all necessary support. Unique features include concrete hardstand, rappelling tower, and antenna platform. Includes utilities, site improvements, pavements (roadway, parking and marshaling yard), communications, passive force protection and all other necessary support. Demolition includes buildings 91033, 91065, 91070, 91032, 91037, and 99020. This project will construct facilities totaling 103,700sf with foundation and floor slab, structural framing, insulated walls, sloped roofs, environmental control, fire detection and suppression and all necessary support. Functional areas include administrative areas (command, operations, logistics, secure planning, training, simulators, weather, intel, and mission support), team rooms, and equipment, vehicle and watercraft maintenance and storage areas (individual gear cages, weapons/armory, radios, computers, dive shop, medical logistics, war readiness materials), covered storage area, etc. Unique features include concrete hardstand, rappelling tower, and antenna platform. Includes utilities, site improvements, pavements (roadway, parking and marshalling yard), communications, passive force protection and all other necessary support. Demolition includes buildings 91033, 91065, 91070, 91032, 91037, and 99020. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low impact development features will be included in the design and construction of this project as appropriate. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations and physical security mitigation in accordance with Department of Defense (DoD) Minimum Anti-Terrorism Standards for Buildings. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Proposed construction duration of 900 calendar days. |
||||||||||||||||||||||||||||||||||||
Details | 1 Military Facility, 103,700 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |