Similar Projects
Simonton Street Improvements
Results
Less than $2,052,336 est. value
Key West, FL 33040

Simonton Street Improvements
Results
Less than $2,052,336 est. value
Key West, FL 33040

Canal Restoration Water Quality Improvement Project Canal #257 Culvert Installation and Berm Break
Results
Marathon, FL 33050

Parking Lot Maintenance
Results
Key West, FL 33040

Deep Well Cleaning and Drainage System Maintenance and Repairs
Results
Less than $210,000 est. value

Re-Construction and Removal of Concrete Sidewalk Curb Cut Ramps, and Curb and Gutter
Results
Less than $350,000 est. value

Construction of the Key Tree Cactus Preserve Boardwalk, Trails, Paths, Kayak/Canoe Landing and Parking Areas
Results
Islamorada, FL 33036

Long Key State Park - Beach Stabilization and Campground Restoration
Renovation
Results
Long Key, FL 33001

Drainage Cleaning on Various Sections of State Roads
Results
Less than $400,000 est. value

Operation Drainage System and Correct any Deficiencies within the Problem Areas as Part of the District Storm Water Management Systems
Results
Less than $500,000 est. value

Drainage Improvements
Results
Less than $1,000,000 est. value

Hurricane Irma Permanent Repairs/Riprap-Rubble Bank And Shore/Articulating Concrete Block Revetment System
Results
Less than $6,753,494 est. value
FL

East Martello Phase II Drainage and Parking Improvements
Results
Key West, FL 33040

The Clarence Higgs Beach Sand Replenishment Project
Results
Key West, FL 33040

Coco Plum Beach Restoration Project
Results
Marathon, FL 33050

Last Updated 04/01/2021 02:36 PM
Project Title

Florida Keys - Sammy Creek Entrance Improvements (Monroe County)

Physical Address View project details and contacts
City, State (County) Upper Sugarloaf Key, FL 33042   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Day use parking improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents