Similar Projects
Site Paving
Post-Bid
Elgin, IL 60120

Asphalt
Term Contract
Post-Bid
Saint Charles, IL

Haines Building - Asphalt Paving Replacement
Results
Saint Charles, IL

2021 City Wide Resurfacing
Renovation
Results
$5,000,000 to $6,000,000 est. value
Aurora, IL

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

2021 Street Program
Post-Bid
Elburn, IL

2020-2021 Crackfill Streets
Results
Less than $79,560 est. value
North Aurora, IL

Roadway Resurfacing
Post-Bid
Saint Charles, IL

2021 Crackfilling Program
Results
Less than $195,597 est. value
Batavia, IL

2021 Polk Avenue Roadway and Utility Improvement
Post-Bid
Carpentersville, IL

2021 MFT Street Rehabilitation
Results
Saint Charles, IL

2021 CDBG Resurfacing Program
Infrastructure
Post-Bid
Carpentersville, IL

Bridge Rehabilitation - 2020SSP1
Results
IL

Last Updated 07/07/2022 07:26 AM
Project Title

Bridge Replacement

Physical Address View project details and contacts
City, State (County) Big Rock, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Replacement Incl. 184.6 Cu. Yd. Conc. Str.; 32.5 Cu. Yd. Conc. Superstr.; 43.0 Cu. Yd. Conc. Str. (Approach Slab); 735 Cu. Yd. Structure Excavation, 35,870 Lbs. Rebar Epoxy Coated; 93 Ft. Steel Railing, Ty Il-oh; 1 Ea. Removal Existing Str.; 422 Ton Hma Binder Course, 176 Ton Hma Surface Course; 666 Sq. Yd. Hma Shoulder; 2,162 Sq. Yd. Aggregate Subgrade Improvement; 1,599 Sq. Yd. Pavement Removal; 830 Sq. Yd. Hma Surf. Removal; 679 Cu. Yd. Earth Excavation; 58 Cu. Yd. Rock Excavation; 138 Ft. Spb Guardrail Type a; 3,600 Ft. Paint Pavement Markings; 349 Cu. Yd Topsoil Excavation & Placement, 0.8 Acre Seeding, 1 Ls. Traffic Control and Protection (Spl.) (Detour); Etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents