Similar Projects
Last Updated | 03/09/2023 03:33 PM |
Project Title | Regional Water Reclamation Facility Contract 4 ADM Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Clinton, IA 52732 (Clinton County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,578,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 9th, 2023 this project is pending an award decision. Project No: 39846 ENGINEERS ESTIMATE: $ 5,500,000 Question Cuttoff Date & Time 2/1/2023 03:00:00 PM (ET) Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. David J. Haugen Veenstra & Kimm, Inc. dhaugen@v-k.net 319.382.9327 Construct wastewater submersible pump station including all labor, materials, and equipment necessary for excavation, backfill, and site work; reinforced concrete; site piping; manholes; submersible pumps; prefabricated control building with electrical and control equipment including conduit, cables, wiring, motor controls, starters, switches, fixtures, generator, and transfer switch; metering manhole and associated work, including cleanup The location of the work to be done and the kinds and sizes of materials proposed to be used are as follows Construct wastewater submersible pump station including all labor, materials, and equipment necessary for excavation, backfill, and site work; reinforced concrete; site piping; manholes; submersible pumps; prefabricated control building with electrical and control equipment including conduit, cables, wiring, motor controls, starters, switches, fixtures, generator, and transfer switch; metering manhole and associated work, including cleanup. BID SECURITY: Certified check, cashier's check, certified share draft or bid bond in the amount of five percent (5%) of the bid. Bidders shall use the bid bond form bound in the specifications. COMPLETION DATE: All work on the contract shall be: Substantial Completion - May 30, 2024 Final Completion June 30, 2024 DIRECT QUESTIONS TO: Mark A. Seip, Veenstra & Kimm, Inc. 515-225-8000 mseip@v-k.net |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |