Similar Projects
Smithville Road Culvert Replacement - BR-2017-009H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Mapleton, IL 61547

Voorhees Road Bridge Replacement - BR-2018-009H - County of Peoria
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Edwards, IL 61528

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Material Quotations
Infrastructure
Post-Bid
Peoria, IL

Highview Road Pavement Patching Plan Illini Drive to Rue Vue Du Lac Project
Infrastructure
Post-Bid
Peoria, IL

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Partial Roadway Replacement - Peoria Stadium
Infrastructure
Results
Peoria, IL 61614

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

County Road 201 Remodel and Technology Upgrade - CH-19-003 - County of Peoria
Infrastructure
Conception
$350,000 CJ est. value
Peoria, IL 61603

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Elmwood, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Cottonwood Road Culvert Replacement - BR-2020-002H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Logan Township, IL 61536

Sealcoating
Infrastructure
Post-Bid
IL

General Wayne A. Downing Peoria International Airport
Renovation, Infrastructure
Results
Peoria, IL

Last Updated 02/27/2023 03:02 PM
Project Title

Sidewalk and ADA 2022

Physical Address View project details and contacts
City, State (County) Peoria, IL 61603   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvement consists of sidewalk, ADA ramps, curb and gutter and driveway pavement removal and replacement and all necessary adjustments, incidentals and appurtenances as shown in the plans in various locations throughout the City of Peoria. All proposals must be accompanied by cash, certified check, cashier's check, or a bid bond for not less than five percent (5%) of the amount of the bid. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Stormwater Engineer. Compliance with the Illinois Prevailing Wage Act is required under this contract. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents