Similar Projects
CMc Services for the Philadelphia Custom House Mechanical & Plumbing Renovation Project, Philadelphia, PA
Post-Bid
$70,000,000 to $85,000,000 est. value
Philadelphia, PA 19106

Philadelphia Zoo Animal Hospital - Mechanical Equipment Replacement
Post-Bid
Philadelphia, PA 19104

James Rhoads Elementary School Major Renovation - Mechanical
Results
Less than $3,076,811 est. value
Philadelphia, PA 19139

Boiler Burner Repairs
Results
Philadelphia, PA

MATSCC Rainwater Replacement Project
Post-Bid
Philadelphia, PA 19123

Midvale Depot HVAC and Roof Replacement- Mechanical Construction
Results
Philadelphia, PA 19144

Philadelphia International Airport - Airport Operations Center (AOC) - Mechanical Construction
Alteration
Post-Bid
$100,000 to $300,000 est. value
Philadelphia, PA 19153

Philadelphia International Airport at Terminal D/E CBIS Recapitalization - Mechanical
Results
$10,000 to $100,000 est. value
Philadelphia, PA 19153

Various MEP Improvements at Philaport Facilities
Alteration
Post-Bid
Philadelphia, PA

New Addition and Renovations at Ethan Allen Elementary School - Mechanical
Results
Less than $3,449,346 est. value
Philadelphia, PA 19149

Powelton Yard Improvement Project - Mechanical Construction
Alteration
Post-Bid
Philadelphia, PA 19104

Lemon Hill Mansion Rehabilitation - Mechanical Construction
Results
$100,000 to $300,000 est. value
Philadelphia, PA 19130

Major HVAC Renovation at Vare-Washington Elementary School - Mechanical
Alteration
Post-Bid
$3,736,178 est. value
Philadelphia, PA 19147

Penn Treaty High School Science Lab Renovations - Mechanical Construction
Results
Less than $96,500 est. value
Philadelphia, PA 19125

Toilet Room Renovations at James Logan School - Mechanical
Alteration
Post-Bid
$160,803 est. value
Philadelphia, PA 19141

Last Updated 10/26/2021 12:33 PM
Project Title

Episcopal Hospital Boiler Plant Upgrade - Mechanical

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19125   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Temple University intends to upgrade the existing boiler plant located at Episcopal Hospital in Philadelphia which will service the existing hospital. Completion of the boiler plant upgrade is tentatively scheduled for the fall of 2021. The upgrade will consist of the installation of three new high-pressure steam boilers with stack economizers and select ancillary equipment, including, but not limited to, new fans and heating coils as part of the combustion air system, new fuel oil pump system, controls including metering devices and tie-in to the building automation system for control and monitoring, new panels, breakers, circuits, conduit and wiring, starters, disconnects to accommodate new or re-used mechanical equipment as well as controls. The upgrade also includes fire alarm system modifications and the installation of new electrical equipment such as lighting fixtures, outlets, etc. The disconnect and removal of the existing boilers and associated ancillary equipment currently located in the plant building as well as providing temporary boilers during construction will be included in the overall Scope of Work. The Episcopal Hospital Boiler Plant Upgrade Project is structured as a multi-prime Contract arrangement. The Prime Contractors will include: General, Mechanical, Plumbing and Fire Protection, and Electrical.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents