Similar Projects
Boeckman Creek Regional Trail - Phase 2 (Frog Pond) - CIP #9149 - City of Wilsonville
Infrastructure
Conception
$620,000 CJ est. value
Wilsonville, OR 97070

Eastside Wildlife Areas Aerial Granular Herbicide Application Project
Renovation
Design
$270,000 CJ est. value
Salem, OR 97301

Construct Phase III Sucker Fish Ponds
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Klamath Falls, OR 97603

Juniper Elementary School Ceiling Fans
Renovation
Sub-Bidding
$149,000 CJ est. value
Bend, OR 97701

Hazardous Materials Abatement and Demolition for Tony's Building Property
Term Contract, Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
The Dalles, OR 97058

Water Quality Testing and Analysis Services
Infrastructure
Post-Bid
Tigard, OR

Walker MS Asbestos Abatement
Alteration
Post-Bid
$140,000 est. value
Salem, OR 97304

Lincoln High School Abatement
Renovation, Demolition
Results
Portland, OR

Huestis Hall Renovation Asbestos Abatement
Term Contract
Results
$200,000 est. value
Eugene, OR 97403

RFQ - Engineering and Design and/or Construction Management Services for Large-Scale Habitat Restoration Projects
Term Contract
Pending Verification
Portland, OR 97204

Demolition of Five Public Safety Communication Tower
Demolition, Infrastructure
Post-Bid
$50,000 CJ est. value
Milwaukie, OR 97222

2022 King Asbestos Abatement
Alteration
Results
$80,000 est. value
Portland, OR 97211

RFQ Contractor - South Obenchain Fire Restoration Project
Infrastructure
Post-Bid
$750,000 CJ est. value
Central Point, OR 97502

2022 Stephenson Asbestos Abatement
Alteration
Results
$60,000 est. value
Portland, OR 97219

Demolitions and Hazmat Remediation - Cairo Junction Property
Demolition, Infrastructure
Post-Bid
$90,000 CJ est. value
Ontario, OR 97914

Last Updated 04/17/2023 08:27 AM
Project Title

Demolition of Miles Fiberglass Building

Physical Address View project details and contacts
City, State (County) Happy Valley, OR 97086   (Clackamas County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $265,893 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

JOB DESCRIPTION Contractor shall perform the following: a. Ensure total and complete removal of all solid waste inside and outside of identified structures that are located on the subject property to an authorized disposal facility and submit copies of disposal receipts to the County. b. Keep all hazardous materials to include solvents and all petroleum based products on site and protect such hazardous materials from spilling or leaking during the course of the contract until the contractor can dispose of these products in a manner consistent with DEQ rules for collecting and disposing of hazardous materials. c. Demolish all structures on the subject property to include the large building plus any accessory or outbuildings. The foundation shall be removed and the area graded to a maximum of a 2:1 (horizontal:vertical) slope d. Be responsible for acquiring all demolition permits from Clackamas County Building Services and provide a copy of said permits to the County. e. Contact appropriate utility agencies to disconnect services. Power service may remain on during job performance if required. Copies of all requests and/or work orders relative to utility disconnect will be provided to the County. f. All areas disturbed by removal and or demolition shall be seeded with a fast germinating grass seed. In addition, all disturbed areas shall be covered with straw mulch. g. Complete all work no later than the date set out and commence work only after receipt of Notice to Proceed from Clackamas County. h. Keep all debris off of adjacent properties and road right-of-ways during the execution of this contract. i. Not allow anyone onto the subject property during this project except for himself, his employees or agents, personnel from utility services to disconnect services, or County staff or agents. j. Board up or otherwise restrict access into the existing buildings at the earliest possible opportunity and at the end of each workday until demolition of said structure is completed. k. Keep dirt and mud off of roadways in accordance with County road ordinances. n. Protect existing street trees, landscaping, sidewalks and curbs along all streets adjacent to the subject property. Any damaged items caused as a result of the contractor's work will be repaired and/or replaced by the contractor at their own expense. JOB LOCATION 8855 SE Otty Road, Happy Valley, Oregon INTRODUCTION: The purpose of this document is to outline general requirements for the removal or demolition of specifically identified structures and/or solid waste materials, including materials classified as "hazardous waste" from real property owned by the Clackamas County Development Agency. The types of structures and materials to be removed may include a large concrete tilt-up building, asphalt, storage tanks, vegetation, miscellaneous outbuildings and other structures and related debris, including "hazardous wastes" as defined under ORS Chapter 465 and 466. All debris and wastes shall be removed to an approved recycling facility to the greatest extent practical and/or possible. Contractors employed by the County shall provide all the equipment, labor and materials necessary to demolish, clear, collect, remove and properly dispose of specific structures and materials under the direction of Clackamas County. All project work ordered by the County shall be completed by the contractor in full compliance with all applicable laws and county specifications, required time frames and other contract terms and conditions. The cost and expense for licenses, permits and other jurisdictional authorities shall be borne by the contractor and made a part of any bid submitted. BACKGROUND: The Clackamas County Development Agency owns a 2.6 acre property that was the former location of Miles Fiberglass. Existing buildings on the property include a large, single story structure, an out building and other smaller structures. The Agency has a desire to prepare this property for potential redevelopment. In order to accomplish this, these dated structures need to be removed. Request for Clarification or Change Deadline ................................................. February 28, 2023

Details

47,000 SF.
Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents