Similar Projects
Nashbird Chicken Restaurant
New Construction - 2,550 SF
Conception
$500,000 to $1,000,000 CJ est. value
Oklahoma City, OK 73127

Street Enhancements: Plaza Area along NW 16th Street
Infrastructure
Conception
$680,000 est. value
Yukon, OK 73099

AutoZone #0569
New Construction - 6,000 SF
Design
$500,000 to $1,000,000 est. value
Oklahoma City, OK 73132

Intersect Modif
Infrastructure
Design
$8,000,000 CJ est. value
El Reno, OK 73036

Caliber Collision / Yukon
Renovation - 17,222 SF
Bidding
$3,000,000 CJ est. value
Yukon, OK 73099

Emergency Traffic Signal for Mustang Fire Station No. 2
Infrastructure
Bidding
$200,000 CJ est. value
Mustang, OK 73064

Piedmont Middle School
New Construction
Post-Bid
$16,000,000 est. value
Piedmont, OK 73078

Walmart Supercenter #2804-253 - SPRB-R
Renovation
Post-Bid
Oklahoma City, OK

Street Resurfacing and Repair
Infrastructure
Results
$2,650,000 est. value
Oklahoma City, OK

Britton Road Paving Repairs
Infrastructure
Results
$254,967 CJ est. value
El Reno, OK 73036

Sephora at Kohl's #489
Renovation - 1,000 SF
Construction
Yukon, OK 73099

Hawaiian Bros Island Grill
Build-Out - 3,260 SF
Construction
Yukon, OK 73099

Classen Marquette Apartments and Retail
New Construction
Pending Verification
Oklahoma City, OK 73195

Classen Marquette Apartments and Retail
New Construction
Pending Verification
Oklahoma City, OK 73195

Arterial Resurfacing: SW 104th Street from N Morgan Road to S County Line Road
Infrastructure
Conception
$550,000 est. value
Mustang, OK 73064

Last Updated 05/12/2023 12:06 PM
Project Title

Flour Mill & Coop Mill Redevelopment / Yukon Technology Center

Physical Address View project details and contacts
City, State (County) Yukon, OK 73099   (Canadian County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Convention/Exhibit Center, Food/Beverage Service, Hotel/Motel, Museum, Office, Parking Garage, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Schematic Drawings, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $120,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a mixed use development on both sides of Main Street near 3rd Street. As of March 21, 2023 the project is on-hold. General contractor information and a construction timeline are not available.

Details

,, 476,920 SF - 2 Stories Above Grade, 20,000 SF. 6 Stories Above Grade, 136,000 SF. 6 Stories Above Grade, 136,000 SF. 2 Stories, 2 Stories Below Grade, Parking Spaces, 960 Parking Spaces. 6 Stories Above Grade, 25,920 SF. 5 Stories Above Grade, 130,000 SF. 14,000 SF. 2 Stories Above Grade, 15,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents