Similar Projects
Centennial Park - Phase 1 SW Corner
Renovation, Infrastructure, Alteration
Conception
$1,700,000 est. value
Waukee, IA 50263

170th Street and Meredith Drive - TR19-02 - City of Urbandale
Infrastructure
Conception
$260,000 est. value
Urbandale, IA 50263

43rd Street Reconstruction
Infrastructure
Design
$605,625 CJ est. value
Davenport, IA 52806

HMA Resurfacing With Milling - I-35
Infrastructure
Design
$500,000 CJ est. value
Latimer, IA 50452

High School Addition & Renovation
Addition, Demolition, Renovation, Infrastructure - 192,000 SF
Bidding
$3,000,000 CJ est. value
Orange City, IA 51041

Sterile Processing Services Addition and NFS Dock Renovations project at the VA Central Iowa Health Care System
Addition, Demolition, Renovation, Infrastructure - 13,955 SF
Bidding
$20,000,000 CJ est. value
Des Moines, IA 50310

Cedar Falls High School Natatorium
New Construction, Infrastructure - 37,000 SF
Sub-Bidding
$13,400,000 CJ est. value
Cedar Falls, IA 50613

Single Family Residential Renovation and Repair Project
Renovation
Post-Bid
Fontanelle, IA 50846

Rehabilitation of an Owner-Occupied Residence
Renovation
Post-Bid
Waterloo, IA 50703

Single Family Housing Rehabilitation
Renovation
Results
Corwith, IA

Auxiliary Site Clearing
Demolition, Alteration
Results
Davenport, IA 52802

Riverwoods Single Family & Townhome Develompent
New Construction
Pending Verification
Des Moines, IA 50320

Roy Dave Housing Addition
New Construction
Pending Verification
Sioux City, IA 51104

Bee Branch Interceptor Sewer Connection - 710-1298 - City of Dubuque
Infrastructure
Conception
Less than $3,200,000 est. value
Dubuque, IA 52001

Ida Grove City Hall project
New Construction, Infrastructure - 4,700 SF
Design
$1,490,000 CJ est. value
Ida Grove, IA 51445

Last Updated 09/02/2022 08:31 AM
Project Title

Lead Based Paint Remediation - 308 North 2nd Street

Physical Address View project details and contacts
City, State (County) Marshalltown, IA 50158   (Marshall County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents