Similar Projects
Last Updated | 12/21/2021 06:36 AM |
Project Title | Tanyard Reservoir Flood Prevention and Mitigation Project |
Physical Address | View project details and contacts |
City, State (County) | Bristol, RI (Bristol County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Excavation of sediment and debris from area subject to storm flowage 2. Installation of riprap stilling basins at two of the three existing stormwater outfalls 3. Expansion of the existing sediment forebay 4. Installation of an eight-foot-wide grassed access path 5. Other related civil/site work necessary to complete the project as designed 6. Refer to Section 01010 for schedule limitations and sequence of operations |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |