Similar Projects
2022 Pavement Management Program
Infrastructure
Bidding
$500,000 est. value
Gardner, KS

Helen Cuddy Rose Garden Renovation and Improvements
Renovation, Infrastructure
Bidding
$750,000 est. value
Mission, KS

Moonlight Sidewalk
Post-Bid
Gardner, KS

49th and Quivira CMP Stormwater Replacement
Infrastructure
Post-Bid
Shawnee, KS

2021 Cars 50th Street and Stateline Road
Results
$100,365 est. value
Westwood Hills, KS

Cured in Place Pipe Project
Results
Gardner, KS

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

Cured in Place Pipe Rehabilitation
Term Contract
Results
Gardner, KS

2021 Stormwater Pipe Repair East
Infrastructure
Post-Bid
Shawnee, KS

K-7 and Prairie Star Parkway Interchange
Infrastructure
Results
Lenexa, KS 66220

Signal and Sidewalk ADA Improvement Project
Infrastructure
Post-Bid
Shawnee, KS

82nd Street Sidewalk Improvements
Infrastructure
Results
De Soto, KS

Safe Routes to Schools Program
Infrastructure
Post-Bid
Olathe, KS

Brook Ridge Unit Four Sewer, Water and Street Improvements
Infrastructure
Results
$408,010 est. value
Lenexa, KS

Reported 04/26/2022 09:08 PM
Project Title

Streets Improvement and Ocheltree Street Sanitary Rehabilitation

Physical Address View project details and contacts
City, State (County) Olathe, KS   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Street reconstruction including curb and gutter replacement, driveway replacement, sidewalk and ADA ramp installation, storm sewer installation, portions of waterline replacement, portions of sanitary sewer replacement, streetlight installation and lawn restoration. The project may include water/soil treatment and disposal. The project will include Ocheltree Street (Cedar to Lane), Lane Street (Ocheltree to Glendale), Parkway Drive (Lane to Glendale), Glendale Drive (Cedar to Ocheltree).

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Exterior Lighting, Roadway Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Accessories, Landscape Surfacing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents