Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Deer Valley Road, El Mirage to 109th Avenue
Bidding
Phoenix, AZ 85038

System Preservation
Bidding
Less than $14,600,000 est. value
Avondale, Phoenix, Tolleson, AZ

Paving and Resurfacing of Streets
Post-Bid
Tempe, AZ 85280

2019 Mill and Overlay Project
Post-Bid
Scottsdale, AZ 85256

2nd Avenue Streetscape 2nd Avenue Between Morris and Robson
Results
$50,000 to $60,000 est. value
Mesa, AZ 85211

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Riverpoint Parking Lot Addition
Addition
Construction
Phoenix, AZ 85040

Installation of Mitigation Devices - Speed Cushions
Bidding
Goodyear, AZ

Phase VII Pavement Replacement
Post-Bid
Guadalupe, AZ 85283

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

35th Ave, Carver to Elliot
Bidding
AZ

Update Pavement Management Program
Post-Bid
Cave Creek, AZ

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

Last Updated 04/26/2021 02:23 AM
Project Title

Capacity Additions (Engineering) - Roadsway Construction

Physical Address View project details and contacts
City, State (County) Buckeye, AZ 85326   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $117,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project is located in the City of Buckeye in Maricopa County on I-10, starting at MP 112.07 and extending east to MP 122.72. The work consists of adding a third general purpose lane in each direction in the median from State Route 85 to Verrado Way. The work consists of construction of new diverging diamond traffic interchanges at Miller Road and Watson Road including the overpass bridges, ramps and crossroad. Approximately 0.6 miles of existing Miller Rd and 0.5 miles of existing Watson Road will be fully reconstructed. The work includes: roadway excavation, asphaltic concrete, Portland Cement Concrete Pavement asphalt rubber-asphaltic concrete friction course, sound walls, drainage facilities, pavement marking, signing, lighting, freeway management system and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents