Similar Projects
Lone Star Medical Center
New Construction - 15,430 SF
Design
$2,000,000 est. value
Allen, TX 75013

3T MRI Suite
Build-Out - 3,483 SF
Design
Plano, TX

Stonebridge Family Vet / McKinney
New Construction - 9,043 SF
Bidding
$2,200,000 est. value
McKinney, TX 75072

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Metrocare Services - River Bend
Build-Out - 2,500 SF
Post-Bid
Dallas, TX 75247

Surgery Center of North Texas
New Construction - 23,000 SF
Construction
$7,500,000 est. value
Anna, TX 75409

National Medical Center Building
New Construction - 48,600 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Plano, TX 75205

Texas Oncology Plano Alliance
Renovation - 6,126 SF
Pending Verification
$875,000 est. value
Plano, TX 75093

Richardson Dialysis Interior Renovation/ USRC Richardson
Renovation - 1,552 SF
Pending Verification
$470,000 est. value
Richardson, TX 75082

Four Corners Mixed-Use Development
New Construction
Design
Frisco, TX 75078

Metrocare Services - Sylvan
Renovation - 15,600 SF
Post-Bid
Dallas, TX 75208

Panther Creek Medical Office
Build-Out - 8,000 SF
Construction
$400,000 est. value
Frisco, TX 75035

Allen Dental Expansion / Center
Addition - 3,332 SF
Pending Verification
$1,000,000 est. value
Allen, TX 75013

Basepoint - McKinney
Addition - 7,249 SF
Design
$1,200,000 est. value
McKinney, TX 75069

Anna Medical Offices
New Construction - 30,000 SF
Post-Bid
$5,000,000 est. value
Anna, TX 75409

Reported 06/24/2022 12:20 PM
Project Title

Finish-out for Metroplex Medical Centre Plano Clinic / Preston Parker Crossing

Physical Address View project details and contacts
City, State (County) Plano, TX 75093   (Collin County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2022, Construction Completion Expected September 2022
Bids Due View project details and contacts
Estimated Value Less than $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodel of existing lease space in a strip center. A building permit was applied for on June 1, 2022, but has not been issued as of June 23, 2022. An architect has been selected; however, a general contractor or selection method is not disclosed. Although a firm timeline cannot currently be established, construction is not expected to commence prior to third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Medical Office/Outpatient, Approximately 2,977 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents