Project Title | N059--Sources Sought Notice UPS System Installation, Coatesville PA VAMC |
Physical Address | View project details and contacts |
City, State (County) | Coatesville, PA 19320 (Chester County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of this project is to install three UPS systems and a screen monitor on the boiler control system panel at Building 14, along with the needed programming. SCOPE: The contractor shall provide all labor, supplies, transportation, and equipment necessary to install the two UPS systems (unlimited power supply) and a touch screen monitor along with programming for the boiler control system. The installation of 1 touch screen computer: Advantech TPC-1282T 12.1 XGA Panel PC, Intel I3-5010U,4GB RAM Windows 7 Professional 64 bit The installation of 2 Tripp Lite Smart3000Net SmartPro 120V 3KVA 2.4Kw Line-Interactive UPS The installation of 1 Tripp Lite OmniVs1000 OmniVs 120V 1000VA 500W Line-interactive UPS Install Wonderware Intouch v10.1 Install Topserver V5 with Modbus Suite Move Wonderware and Topserver Licenses from old unit Configure Wonderware to run the boiler control system application Testing new computer as the secondary I/O server Update power wiring schematics to show UPS units Install UPS units inside/on top of control cabinet Wire the current power feed to the UPS units Wire UPS outputs to existing power distribution terminal blocks per wiring schematics Installation of UPS equipment to be installed on top of or inside of control cabinet. Confirm correct operation of newly installed equipment PERFORMANCE REQUIREMENTS: The contractor shall comply with all performance requirements listed herein. the Master Construction Specifications (Attachment B), and the Safety and Health During Construction (Attachment C). Materials: The contractor shall only supply new items that are listed or equivalent to those listed in the scope. Testing and Acceptance: At the completion of all performance requirements, the contractor shall demonstrate for the COR that all newly installed items under this contract are functioning properly prior to the Government s final acceptance. Contractor will ensure that operational integrity of the system does not prevent the plant from providing the necessary steam demand during the installation/removal of equipment. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |