Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Courthouse Gas Boiler Replacement
Alteration
Bidding
Central City, CO 80427

Boiler Replacement for Recreation Center Pools
Alteration
Bidding
Longmont, CO 80501

FCF Boiler Number 1 Equipment Bid Pack 1
Post-Bid
Less than $800,000 est. value
Canon City, CO

DWCF LU5 Steam Converter Replacement
Post-Bid
Less than $115,000 est. value
Denver, CO 80239

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Chiller Plant, Fort Collins, Colorado
Results
$1,000,000 to $5,000,000 est. value
Fort Collins, CO 80521

Direct Install Program Evaporative Window Coolers
Alteration
Bidding
CO

Boiler Replacement for Mesa Elementary School
Post-Bid
Westminster, CO 80031

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Chiller Services
Term Contract
Bidding
Thornton, CO

Full-Service Mechanical Maintenance
Post-Bid
Denver, CO

Boiler Replacement
Results
$100,000 to $250,000 est. value
Akron, CO 80720

Standing Order Contractor - Boiler Services
Alteration
Bidding
Bellvue, CO

Reported 04/01/2022 12:00 AM
Project Title

Fitzsimons 2021-049M21 Replace Chiller, Phase 1 of 2

Physical Address View project details and contacts
City, State (County) Aurora, CO 80045   (Adams County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to replace aging equipment and improve reliability to the emergency chilled water system that serves critical spaces in the Fitzsimons (Q20 - Fitz) building and Vivarium Air Handling Units in Research 1 (P18 R1), Research 2 (P15 R2), and the new Anschutz Health Sciences Building (P12 - AHSB) for the University of Colorado Denver | Anschutz Medical Campus (CU-Denver | AMC). The project will be broken into two (2) phases. Phase 1 is devoted to preparation, including piping distribution modifications, that will allow the distribution to be looped and provide circulation reliability without trigging emergency transfer. Phase 2 is devoted to the replacement of the existing n the Fitzsimons building. Estimated Construction Cost: $700,000 FLCC Phase 1 and $1,300,000 FLCC Phase 2.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents