Reported | 04/01/2022 12:00 AM |
Project Title | Fitzsimons 2021-049M21 Replace Chiller, Phase 1 of 2 |
Physical Address | View project details and contacts |
City, State (County) | Aurora, CO 80045 (Adams County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of the project is to replace aging equipment and improve reliability to the emergency chilled water system that serves critical spaces in the Fitzsimons (Q20 - Fitz) building and Vivarium Air Handling Units in Research 1 (P18 R1), Research 2 (P15 R2), and the new Anschutz Health Sciences Building (P12 - AHSB) for the University of Colorado Denver | Anschutz Medical Campus (CU-Denver | AMC). The project will be broken into two (2) phases. Phase 1 is devoted to preparation, including piping distribution modifications, that will allow the distribution to be looped and provide circulation reliability without trigging emergency transfer. Phase 2 is devoted to the replacement of the existing n the Fitzsimons building. Estimated Construction Cost: $700,000 FLCC Phase 1 and $1,300,000 FLCC Phase 2. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |