HVAC Replacement at Cross Keys Middle School
Alteration
Bidding
$300,000 est. value
Florissant, MO 63033

HVAC Replacement and Electrical Upgrade Project at Innovation School at Cool Valley
Alteration
Bidding
$800,000 est. value
Beverly Hills, MO 63121

HVAC and Mechanical Products
Term Contract
Post-Bid

Resilent Flooring
Post-Bid
Saint Louis, MO

Cypress Swamp HVAC Replacement 2021
Results
Saint Louis, MO

Cooling Tower and Closed Systems Water Treatment
Alteration
Results
MO

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Penguin Puffin Coast HVAC Improvements Project
Alteration
Results
Saint Louis, MO 63110

Carpet
Term Contract
Post-Bid
Saint Louis, MO

2021 Hazelwood Temperature Controls System Project
Alteration
Results
Hazelwood, MO 63042

Armstrong Fine Fissured Flooring
Alteration
Post-Bid
Saint Louis, MO

Saint Louis Zoo Sears Lehmann, Jr. Wildlife Reserve Walk-in Freezer
Alteration
Results
Saint Louis, MO

Armstrong Fine Fissured Flooring Tile
Alteration
Post-Bid
Saint Louis, MO

TJ Library - Replace Chiller No. 2
Alteration
Results
Less than $563,000 est. value
Saint Louis, MO

Armstrong Fine Fissured Flooring Tile
Alteration
Post-Bid
Saint Louis, MO

Reported 04/23/2022 12:00 AM
Project Title

Asbestos Air Monitoring at Various Schools

Physical Address View project details and contacts
City, State (County) Florissant, MO   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Flooring, HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Ferguson-Florissant School District is requesting air monitoring and final clearance testing to be completed at each of the below sites. The classrooms currently have carpet installed over existing asbestos tile. The contactor will be removing the carpet, tile and mastic to prepare for the installation of new VCT tile. Below are the specific sites with classroom locations and contractor who will be conducting the asbestos removal. The air monitoring company will be required to work in conjunction with the asbestos removal contractor to ensure all local, county and state laws are followed.

Details

Division 09 - Finishes, Flooring.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents