Similar Projects
Student Union Cultural Center
Renovation
Bidding
$300,000 est. value
Mansfield, CT

UCONN 2000 Code Remediation and Programmatic Renovations Stamford Campus
Renovation - 250,000 SF
Post-Bid
$25,000,000 est. value
Stamford, CT 06269

Business School Instructional Facility at Southern Connecticut State University
New Construction - 64,628 SF
Post-Bid
$33,510,000 est. value
New Haven, CT 06515

Hicks and Grange Student Room Renovations
Renovation
Results
$1,000,000 est. value
Storrs, CT 06269

North Campus Residence Hall Renovations Phase II
Renovation
Results
Storrs, CT 06269

Convocation Center
New Construction - 85,000 SF
Construction
$45,000,000 est. value
Fairfield, CT 06824

Academic and Classroom Building
New Construction - 46,073 SF
Construction
$18,968,000 est. value
New Haven, CT 06520

N3101 and N3102 Xray Unit Replacement/Renovation
Renovation
Post-Bid
Farmington, CT 06032

North Dining Dish Room Renovation
Renovation
Results
Storrs, CT 06269

Hazardville Institute
Renovation - 5,488 SF
Construction
Enfield, CT 06082

Kinesiology Human Anatomy Learning Lab Renovations
Renovation - 632 SF
Post-Bid
Storrs, CT 06269

Emergency Communications Center Tenant Fit-Out and Renovation
Renovation
Results
Fairfield, CT 06825

North Campus Townhouses C & D Units Renovations - 2021
Renovation
Construction
$500,000 est. value
Hamden, CT 06515

Fairfield Hall Site Improvements at WCSU's Midtown Campus
Infrastructure
Post-Bid
Danbury, CT 06810

Longley Hall Bathroom Renovation
Renovation
Results
Mansfield, Storrs, CT 06268

Last Updated 06/16/2022 09:25 AM
Project Title

The Lizzie and Jonathan Tisch Center for Innovation and Active Citizenship

Physical Address View project details and contacts
City, State (County) Washington, CT 06793   (Litchfield County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition of part of a school and the construction of a new building. As of June 15, 2022, this project is pending approval and has obtained funding. Information regarding the selection of a general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

College/University, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents