Similar Projects
Cross Connection Devices
Bidding
Denver, CO

Advance Metering Infrastructure (AMI) System
Bidding
Thornton, CO

Wise Binney Connection Pipeline
Post-Bid
$19,000,000 est. value
Aurora, CO 80111

2020 Sacwsd Water System Removal and Replacements Phase 1
Post-Bid
Commerce City, CO

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

36-Inch Gun Club Rd. Pipeline from E. 26th Ave. to E. 56th Ave
Results
$7,500,000 to $8,100,000 est. value
Aurora, CO 80012

Buckley AFB, Co - Repair & Replace Fire Hydrants
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70
Results
$2,800,000 to $3,000,000 est. value
Aurora, CO 80012

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

Last Updated 03/20/2020 05:15 PM
Project Title

Havana Street 30 Inch Water Line Renewal

Physical Address View project details and contacts
City, State (County) Aurora, CO 80012   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,250,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installing approximately 2,600 feet of 24-inch diameter AWWA fusible C-900 DR-21 PVC pipe within the existing 30-inch steel line, grouting of annular spaces, 200 feet+/- of 24” steel pipe open excavation on Havana St crossing 6th Avenue, approximately 150 feet of open cut installation of 24” of C-900 PVC pipe at transition sections as well as 24-inch and 30-inch Welded steel Pipe at tie-ins. Appurtenances would include isolation valves and vaults, air and vacuum relief valves, 8-inch and 12-inch tie-ins, anodes and test stations. Work would include all Traffic Control, erosion control BMPs and pavement restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents