Similar Projects
The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

Hidden Meadows
New Construction
Design
Cumberland, RI

AutoZone #5132 / Cranston
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Cranston, RI 02910

Design/Build Services for Route 146 Reconstruction
Post-Bid
Providence, RI 02912

Design Build Services for Route 37, Contract 3 (Bridge Group 51B)
Post-Bid
Providence, RI

Design Build Services for I-195 Washington Bridge Phase 2
New Construction
Results
Providence, RI

Girder Repairs to Louisquisset Pike Bridge
Infrastructure
Results
Lincoln, RI

The Preserve at Pippin Orchard
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cranston, RI 02921

Blackstone Street Apartments
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Providence, RI 02905

Canada Dam Infrastructure - 1.9 - City of Providence
Renovation, Infrastructure
Conception
$4,000,000 CJ est. value
Providence, RI 02903

Community Music Works
New Construction, Infrastructure - 11,033 SF
Design
$5,000,000 CJ est. value
Providence, RI 02909

Paving Project
Infrastructure
Post-Bid
Providence, RI

Powers Bridge Access Renovation
Renovation
Results
North Providence, RI 02908

661 Park
Demolition, New Construction, Infrastructure - 5,132 SF
Pending Verification
$27,000,000 CJ est. value
Cranston, RI 02910

Last Updated 10/11/2022 10:33 AM
Project Title

Bridge Group 14 - Rt 99 Cum, Lin

Physical Address View project details and contacts
City, State (County) Lincoln, RI 02838   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2022-CB-046, BHO-BG14(001) PTS ID 0013T, TIP ID 3016. This is a bridge rehabilitation project geared to extend the life of four steel girder bridges with cast-in-place concrete decks with bituminous wearing surfaces. The work includes major concrete repairs, steel repairs, deck over backwall extension, repairs to connections and coating of post-tensioning strands, scupper pipe repaint/replacement, deck repair, bridge washing and painting, bridge concrete sealing, new waterproofing membranes, wearing surface replacements, deck joint repair/replace, bearing replacement, etc RI DOT - Bridge Group 14 - Rt 99 Cum, Lin

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents