Similar Projects
American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Paving & Site Lighting
Post-Bid

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

Sidewalk Rehabilitation Program - 2020 CDBG
Results
New Haven, MI 48048

0.33 MI of Hot Mix Asphalt Shared Use Path, Concrete Curb, Gutter, Sidewalk and Ramps, Aggregate Base And Pavement Markings
Results
MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Street Rehabilitation Program(Margo Drive, James Curtain Drive)
Infrastructure
Post-Bid
New Haven, MI 48048

MISD - Admin Parking Lot Expansion
Results
Less than $2,048,000 est. value
Clinton Township, MI

PMC Project-Crack and Joint Repairs on M-3 Macomb County
Infrastructure
Post-Bid
Mount Clemens, MI

Design-Build Project: 9.02 MI of Concrete Pavement Reconstruction, Concrete Curb and Gutter, Sidewalk, Culvert Replacement, Signing and Pavement Markings
Results
MI

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Calumet-Swedetown Trail Capping, And Route Grading
Results

Compensating Cut at 28 Mile Road Near NB Clinton River
Infrastructure
Post-Bid
Mount Clemens, MI

Last Updated 08/02/2022 01:08 PM
Project Title

St Clair Shores Golf Course Parking Lot Reconstruction

Physical Address View project details and contacts
City, State (County) St Clair Shrs, MI 48082   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

General Requirements - Bid Deposit Required - Installation Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % The removal and reconstruction of the parking lot, golf cart parking areas, surrounding sidewalks and cart path, and all other associated labor and materials required to complete work in accordance with the attached plans and specs. Prequalification: At least 5 years' experience in the Scope of Work. Project Questions: Michael Santoni, msantoni@aewinc.com Substantial Completion: Contractor shall pay Owner $500.00 for each day that expires after the time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents