Similar Projects
Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Alteration
Bidding
Phoenix, AZ 85009

Lake Mary Waterline Material and Installation of Log Truck Crossings
Infrastructure
Bidding
$200,000 est. value
Flagstaff, AZ

Domestic Water, Fire Protection and Irrigation Systems Improvements
Term Contract
Post-Bid
Yuma, AZ

Small Water Meter Installation, Repair and Consulting Services
Post-Bid
Chandler, AZ

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Water Distribution System Replacement
Renovation
Construction
$500,000 est. value
Tucson, AZ 85750

Contractor - Job Order Contract (JOC) for Pre-stressed Concrete Cylinder Pipe (PCCP) and Concrete Cylinder Pipe (CCP) Modifications
Infrastructure
Bidding
Tucson, AZ

N--AZ-San Bernardino NWR-Replacement Wells
Post-Bid
$120,000 to $175,000 est. value
Douglas, AZ

Various Size Automated Meter Reading (AMR) Water Meters
Results
Tucson, AZ

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

Phase XX Roadway, Waterline and Traffic Signal Improvements
Infrastructure
Bidding
$6,900,000 to $8,000,000 est. value
Mesa, AZ

Navajo Nation Western Navajo Pipeline Phase 1 - Bodaway-Gap Well Project
Post-Bid
Fort Defiance, AZ 86504

Carrizo Production Wells
Results
$100,000 to $250,000 est. value
Fort Apache, AZ

Last Updated 04/26/2022 11:33 AM
Project Title

Water System Well 4 and Waterline Improvements

Physical Address View project details and contacts
City, State (County) Golden Valley, AZ 86413   (Mohave County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Project includes to installation of a 12-inch ductile iron waterline connection to Well No. 4 in the I-40 Industrial Corridor Water System (I-40 ICWS). Well No. 4 of the I-40 ICWS is located west of Interstate 40 in the center of Section 10, T20N, R18W, along Jaguar Road starting just south of Ocotillo Road and terminating at Yucca Drive in Golden Valley, Arizona.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents