Similar Projects
Frankfort Parcels B and C Development
Demolition, New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Frankfort, KY 40601

Two Electrical Pedestals
Infrastructure
Design
$200,000 CJ est. value
Frankfort, KY 40601

Asphalt Resurfacing - KY-420
Infrastructure
Bidding
$600,000 CJ est. value
Frankfort, KY 40601

Asphalt Resurfacing - US-421
Infrastructure
Bidding
$600,000 CJ est. value
Frankfort, KY 40601

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Service Line Replacement
Infrastructure
Post-Bid
Frankfort, KY 40601

Peaks Mill Water District Sulphur Lick Road Booster Pump Station
New Construction, Infrastructure
Results
$250,000 CJ est. value
Frankfort, KY 40601

2023 Street Resurfacing
Infrastructure
Results
$500,000 CJ est. value
Frankfort, KY 40601

Wilkinson Boulevard Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Frankfort, KY 40601

Norton Immediate Care Center
New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,000,000 CJ est. value
Frankfort, KY 40601

Asphalt Resurfacing - KY-1263
Infrastructure
Bidding
$600,000 CJ est. value
Frankfort, KY 40601

Pavement Markers and Reflectors
Infrastructure
Post-Bid
$600,000 CJ est. value
Richmond, KY 40475

Capitol Site Improvements
Infrastructure
Results
$86,175 CJ est. value
Frankfort, KY 40601

KSP-KEWS Tower New Shelters - W2/C1
Demolition, New Construction, Infrastructure
Bidding
$854,159 CJ est. value
Frankfort, KY 40601

Airport Construction
Infrastructure
Post-Bid
$6,499,482 CJ est. value
Frankfort, KY 40601

Last Updated 05/11/2023 12:08 PM
Project Title

KVA - EKVC-Water System & Cooling Tower Demo

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $685,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of two existing evaporative coolers for heat pump hydronic system that were left abandoned under a previous project. Plumbing improvements include installation of four new electric water heaters, panelboard and automatic transfer switch and circuits for emergency power. Two new potable hot water recirculation loops will be installed throughout the building and heat trace will be deactivated. Installation of a new emergency water distribution system with self-priming pump will deliver non-potable water to selected janitor mop sinks throughout the building.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents