Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

DSTT State of Good Repair Curved NB1612 Rail Replacement
Infrastructure
Bidding
$2,313,000 CJ est. value
Seattle, WA 98164

Precast Concrete Products - Value Blanket
Alteration
Post-Bid
Spokane, WA

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Kelsey Creek Picnic Shelter Paving
Infrastructure
Results
$15,000 est. value
Bellevue, WA 98005

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Russell Creek Project
Alteration
Post-Bid
WA

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Concrete Pavement Repair Project
Infrastructure
Results
Washougal, WA 98671

West Canal Polyurea
Alteration
Post-Bid
Quincy, WA 98848

Ready Mix Concrete
Alteration
Results
$219,175 est. value
Tacoma, WA

Last Updated 09/09/2022 07:03 AM
Project Title

Heather Lake Trail

Physical Address View project details and contacts
City, State (County) Snohomish, WA 98290   (Snohomish County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Period of Performance: 09/19/2022 to 10/31/2023 0001 Trail Reconstruction & Maintenance, Tread 1 LS Reconstruction, Logging out and Brushing, Shallow Stream Fords/Rock, Culvert Removal and Maintenance, Waterbars-Log, Waterbars-Rock, Parallel Ditches, Lead-Off Ditches, Drain Dips, Switchbacks -Reconstruction, Turnpike, Puncheon Replace, Retaining Wall Rock, Crib Ladder Stairways, Mobilization Between $100,000 and $250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents