Similar Projects
Coconino Estates Phase II Improvements
Bidding
Flagstaff, AZ

Palm Lane Storm Drain: 28th Place to 32nd Street - Design-Bid-Build
Bidding
Phoenix, AZ

Storm Drain Catch Basins
Term Contract
Post-Bid
AZ

Fairway Oaks/Chaparral Sewer
Post-Bid
Sedona, AZ

Y--Haekel Rd San Simon Crossing Culvert
Results
$1,000,000 to $1,500,000 est. value
Safford, AZ

Rancho Los Oros Roadway Improvements
Results
Less than $520,000 est. value
San Luis, AZ 85349

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

Pecos Parcel - Water and Sewer
Construction
$51,000 est. value
Chandler, AZ 85226

Bethany Home Road Storm Drain 43rd Avenue to 51st Avenue
Bidding
$10,000,000 est. value
Glendale, AZ

Prison Hill Siphon
Post-Bid
Yuma, AZ

Stormwater Infrastructure and Drywell Cleaning, Maintenance and Repair
Term Contract
Results
Tempe, AZ 85280

128th Street Box Culvert Construction Project
Construction
Scottsdale, AZ 85255

Water Distribution System Replacement
Renovation
Post-Bid
$500,000 est. value
Tucson, AZ 85750

Northside Canal Siphon Inspection Rehabilitation and Lining Project
Results
Coolidge, AZ

Landfill Gas, Groundwater and Storm Water Systems Installation, Maintenance, Parts and Service
Term Contract
Results
Glendale, AZ 85301

Last Updated 11/19/2020 10:34 AM
Project Title

M--La Posa Box Culvert and LWC Design / Construction

Physical Address View project details and contacts
City, State (County) Quartzsite, AZ 85346   (La Paz County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the following: 1. Base Work: Properly size, fabricate and install a precast concrete box culvert of sufficient cross-section to convey flow unimpeded, that is, without causing backup. Include one upstream and one downstream reinforced concrete cutoff walls, two upstream and two downstream precast concrete wing walls, one upstream and one downstream precast headwalls, and erosion control and earthwork. The flow shall be the maximum capacity limited to the channel itself in which the box culvert will sit. 2. Additive Work: Construct an ADOT-style, concrete, low-water crossing, and erosion control with earthwork in accordance with the specifications and to industry standards.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents