Similar Projects
Sutton Place Townhomes
New Construction
Conception
Monroe, NC

Regent Pines
New Construction
Conception
$37,000,000 est. value
Monroe, NC

Waxhaw Landing
New Construction
Design
Monroe, NC 28112

Construction of a Roundabout
Infrastructure
Design
$1,026,396 CJ est. value
Weddington, NC 28173

Grading, Paving, Drainage, Thermoplastic Pavement Markings and Signals
Infrastructure
Bidding
$2,000,000 CJ est. value
Monroe, NC 28110

Waxhaw Downtown Park Phase 2
New Construction, Infrastructure - 4,597 SF
Bidding
$2,000,000 CJ est. value
Waxhaw, NC 28173

RFQ Construction Manager at Risk - East Elementary School
New Construction, Infrastructure - 299,400 SF
Post-Bid
$70,000,000 CJ est. value
Monroe, NC 28112

South Church Street Stormwater Improvements
Infrastructure
Post-Bid
Waxhaw, NC 28173

Morgan-Windsor Alley Improvements
Demolition
Results
Monroe, NC

Blair Place
New Construction
Pending Verification
Monroe, NC 28110

Wellington Residential Development
New Construction
Pending Verification
Monroe, NC 28110

Bonds Grove Church/NC 16 Intersection - Town of Waxhaw
Infrastructure
Conception
$355,000 CJ est. value
Waxhaw, NC 28173

Christopher Todd Communities At Monroe
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Monroe, NC 28110

853W Transmission Main Phase II - Secrest Shortcut Road
Infrastructure
Bidding
$2,900,000 CJ est. value
Monroe, NC 28110

Forest Hills High School - Paving
Infrastructure
Post-Bid
$800,000 CJ est. value
Marshville, NC 28103

Last Updated 10/31/2022 09:05 AM
Project Title

Broadmoor At Marvin

Physical Address View project details and contacts
City, State (County) Waxhaw, NC 28173   (Union County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 31, 2022, this project is under construction. The developer is acting as general contractor. Completion is expected by end of April 2023.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents