Similar Projects
Valve Exercise and Condition Assessment 2022
Term Contract
Bidding
Saint Joseph, MI

Wall Street Parking Lot Addition
New Construction
Post-Bid
Benton Harbor, MI

Niles Sanitary Sewer Lining Project
Infrastructure
Post-Bid
Niles, MI 49120

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water System Improvements- Napier Avenue - Plaza Dr to Pipestone Road
Results
Benton Harbor, MI 49022

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Smith Court Water Main Improvements Project
Infrastructure
Post-Bid
Benton Harbor, MI 49022

E Napier Avenue & Dewey Avenue 400' West of S. Euclid Ave. to Dewey Ave. and Dewey Ave. from Napier Ave. to 1,700' South
Results
Benton Harbor, MI

Lead Water Service Lines
Infrastructure
Post-Bid
Saint Joseph, MI

Colfax Avenue & Messner Drive, Napier Avenue to Eloise Drive
Results
Benton Harbor, MI

Wastewater System Improvements- M-139, Pipestone Road & Carlton Avenue
Infrastructure
Post-Bid
Benton Harbor, MI 49023

Water Street Lift Station Demolition and Sewer Repair
Results
$120,000 est. value
Benton Harbor, MI 49023

Wastewater System Improvements Francis Avenue, Eastman Avenue, Britain Avenue & Crystal Avenue
Infrastructure
Post-Bid
Benton Harbor, MI 49022

Clay Street Water Main Replacement
Results
Benton Harbor, MI 49022

Sewer Rehabilitation
Infrastructure
Results
Saint Joseph, MI

Last Updated 02/07/2022 08:13 AM
Project Title

Wastewater System Improvements Crystal, Highland, and Vashti Sewer Reconfiguration

Physical Address View project details and contacts
City, State (County) Benton Harbor, MI 49022   (Berrien County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project primarily consists of furnishing all material and constructing the following approximate quantities: 3,300' of Sanitary Sewer Abandonment 365' of 21" and 2,810' of 8" Sanitary Sewer 2,700 ' of Road Reconstruction 390' of 18" Storm Sewer Work also includes, but is not limited to, incidental storm sewer removal and replacement, verification of existing sanitary lateral status, bypass pumping, maintenance of traffic, and restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents