Similar Projects
Prologis Business Park / Plano
New Construction - 1,000,000 SF
Conception
$100,000,000 est. value
Plano, TX 75075

Plano ISD Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Design
$3,500,000 CJ est. value
Dallas, TX 75252

McKinney Trade Center
New Construction - 171,398 SF
Design
$8,000,000 est. value
McKinney, TX 75071

Celina Legacy Hills Water Reclamation Facility Improvements
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Celina, TX 75009

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Post-Bid
$95,000,000 CJ est. value
McKinney, TX 75069

Melissa North Elevated Storage Tank Site Improvements Project
Infrastructure
Post-Bid
Melissa, TX

Trinity Forest Spine Trail Phase 1 - Site Development
Results
Dallas, TX

Excavation Improvements for Inspiration, Phase 4B
Results
TX

North Redbud Warehouse
New Construction - 193,000 SF
Construction
$10,000,000 CJ est. value
McKinney, TX 75069

Delivery Station Warehouse
New Construction - 201,473 SF
Construction
$525,000 est. value
McKinney, TX 75069

Lone Star Medical Center - Building Two
New Construction, Infrastructure - 15,430 SF
Pending Verification
$2,000,000 CJ est. value
Allen, TX 75013

Spring Creek Parkway Mixed-Use Development / Plano
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Plano, TX 75074

Guest House on Garrett / 521 Bryan
New Construction, Infrastructure - 39,870 SF
Design
$3,283,000 CJ est. value
Dallas, TX 75201

Wiley Logistics Park Building 2
New Construction - 490,289 SF
Post-Bid
$10,000,000 CJ est. value
Wylie, TX 75098

Phase 1A and 1B - Grading Package for Waterford on the Lake - South
Infrastructure
Results
Celina, TX

Last Updated 10/04/2022 02:11 PM
Project Title

Custer Self Storage

Physical Address View project details and contacts
City, State (County) McKinney, TX 75035   (Collin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of a (1) two-story climate controlled storage building. Slab-on-grade foundation, metal stud construction, with brick veneer exterior. Interior and exterior lighting and power. As of October 4, 2022, this project is under construction. The identity of the general contractor has not been disclosed.

Details

1 Story Above Grade, 100,064 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents