Similar Projects
Salamanca CSD Improvements - Phase 3.4
Design
Salamanca, NY 14779

Building Renovations and Site Work at School 9
Renovation
Post-Bid
Yonkers, NY 10701

Clarkstown CSD Time and Materials Project
Post-Bid
New City, NY 10956

General Construction, Building Envelope and Restoration at Lincoln High School (DC)
Results
Yonkers, NY 10704

North Collins Central School District Capital Outlay Project 2019-2020
Results
North Collins, NY 14111

Music Conservatory Facilities Improvement and Upgrades
New Construction - 3,500 SF
Construction
$1,000,000 est. value
White Plains, NY 10606

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Clarkstown CSD Time and Materials Project
Post-Bid
New City, NY 10956

Rye City School District - Interior Renovations Contract 1 and 2
Results
$500,000 to $2,000,000 est. value
Rye, NY 10580

Germantown C.S.D. 2015 Capital Projects
Construction
Germantown, NY

Fallsburg CSD 2017 Capital Improvement Project Phase 2B
Post-Bid
Fallsburg, NY 12733

Broadalbin-Perth CSD - 2016 Capital Project - Phase 3 Broadalbin Campus
Results
$9,150,000 to $9,950,000 est. value
Broadalbin, NY 12025

Saint Regis Falls CSD Capital Project
Construction
Saint Regis Falls, NY 12980

Pine Valley CSD 2019 Capital Project Reconstruction Project
Renovation
Post-Bid
Less than $3,500,000 est. value
South Dayton, NY

North Collins Central School District Capital Outlay Project 2018-2019
Results
North Collins, NY 14111

Reported 05/26/2022 12:00 AM
Project Title

Phoenix CSD 2017 Capital Improvement Project Phase 3

Physical Address View project details and contacts
City, State (County) Phoenix, NY   (Oswego County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists includes Building B - Middles School: a new Baseball field and path to the new field. Reconstruction of the existing retaining wall. Concrete pad, fencing and parking modifications at new dust collection system. The interior scope includes selected interior expansion joint replacements. Wall tile finish added to existing walls. Remove and reinstall ceilings to support Mechanical work. New HVAC controls and new dust collection system for technology classrooms. Roof top unit replacement and associated roof work to support Mechanical work Scopes include: hydraulic cement underlayment, steel decking, metal fabrications, rough carpentry, sheathing, penetration fire stopping, joint sealants, expansion control, non-structural metal framing, gypsum board, ceramic tile, acoustical panel ceilings, epoxy terrazzo flooring, interior painting, plumbing, electrical, mechanical, electronic safety and security, earthwork

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents