Similar Projects
Dawson High Agriculture Center
New Construction
Conception
Dawsonville, GA

Park at Perimeter Center East Mixed-Use Development
New Construction, Infrastructure - 90,000 SF
Conception
$200,000,000 CJ est. value
Atlanta, GA 30346

Rough Grading Improvements Bryan County Megasite
Infrastructure
Design
$600,000 CJ est. value
Savannah, GA 31401

Pine Needle Park Playground
Infrastructure
Design
$50,000 CJ est. value
Perry, GA 31069

Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 303
Infrastructure
Bidding
$4,554,718 CJ est. value
Brunswick, GA 31520

Raw Water Transmission Main Renewal Project
Infrastructure
Bidding
$300,000 CJ est. value
Atlanta, GA 30334

Expansion of Tech Square, Phase IIIA
Addition, Demolition, Infrastructure
Post-Bid
$800,000 CJ est. value
Atlanta, GA 30334

New Seminole County PreK-12 Campus
New Construction
Post-Bid
$38,000,000 est. value
Donalsonville, GA

Lanier Islands Conference Center - Phase 1 - Site Preparation
Results
Buford, GA

East Hall High School Modular Building
New Construction
Results
Gainesville, GA 30507

Philadelphia Romanian Church
Addition - 14,285 SF
Construction
Lawrenceville, GA 30045

Chestatee High School Additions and Renovations - Bid Packages 2-24
Renovation, Addition
Construction
Less than $3,000,000 est. value
Gainesville, GA 30506

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Austell Road Townhome Development
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Austell, GA 30106

Kathryn Avenue Bridge Replacement - City of Decatur
Demolition, New Construction, Infrastructure
Conception
$350,000 CJ est. value
Decatur, GA 30030

Last Updated 08/29/2022 10:31 PM
Project Title

Construct Pavilions

Physical Address View project details and contacts
City, State (County) East Ellijay, GA 30540   (Gilmer County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $370,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construct A total of 5 Pavilions. Two 30'X 64' and Three 44'X 64'

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents