Similar Projects
University Boulevard at Rouse Road Intersection Improvements
Bidding
$1,381,618 est. value
Orlando, FL 32800

Main Street Hashtag Connector Phase I
Infrastructure
Bidding
Pensacola, FL 32598

Turkey Creek Road Project
Post-Bid
$3,000,000 est. value
Plant City, FL 33566

Civil/Site Construction Services
Post-Bid
FL

I-75 MLK DDI
Results
FL

Bernath Place New Entrance Road
Results
FL

Hurricane Irma Boca Chica Road Repairs Project
Infrastructure
Bidding
FL

Lake Blanche Drive Extension - Phase 2
Post-Bid
Odessa, FL

Fire Station 17 Concrete Pavement Repair (Set-Aside)
Results
Jacksonville, FL 32254

NE 151 Street and NE 14 Avenue Roundabout
Infrastructure
Bidding
$450,000 est. value
North Miami Beach, FL

2021 Asphalt Patching Services
Post-Bid
Saint Pete Beach, FL

FDOT SCOP Central Avenue Improvements
Results
Less than $635,000 est. value
Crescent City, FL 32112

Piccadilly Park North Subdivision Roadway Paving Project
Infrastructure
Bidding
Lake City, FL 32024

Paver Maintenance
Post-Bid
Naples, FL

Asphalt Sealing, Rejuvenation, and Striping
Term Contract
Results
Melbourne, FL 32940

Last Updated 04/12/2022 10:48 AM
Project Title

Roadway and Paving Repairs Unit Pricing

Physical Address View project details and contacts
City, State (County) Arcadia, FL   (DeSoto County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the preparatory work and operations in mobilizing for beginning work on the project, including, but not limited to, those operations necessary for the movement of personnel, equipment, sanitary facilities, on-site and off-site storage areas, supplies and incidentals to the project site, as required by these specifications, State and Local laws and regulations. The costs of bonds, any required insurance, and any other preconstruction expense necessary for the start of the work, excluding the cost of construction materials, shall also be included in this section. The Contractor shall furnish to the City Inspector, cellular phone numbers capable of communications with the Contractor’s supervisors and foreman

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents