Similar Projects
The Canopies
New Construction, Infrastructure
Conception
$1,200,000 est. value
Wilmington, NC 28403

Smith Creek Park Phase 2A - New Hanover County
New Construction, Infrastructure
Conception
$1,700,000 CJ est. value
Wilmington, NC 28411

First Quality Imports
New Construction - 6,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28405

Trinity Express Tire & Service
New Construction, Addition - 1,292 SF
Design
Wilmington, NC 28412

RFP Construction Manager at Risk - Isaac Bear Early College High School
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Wilmington, NC 28403

Pine Grove Bridge Repair Bridge No. 640006
Infrastructure
Bidding
$200,000 CJ est. value
Wilmington, NC 28409

Randall Library Expansion and Renovation - Package C Audio Visual
Addition, Demolition, Infrastructure - 100,000 SF
Sub-Bidding
$15,000,000 CJ est. value
Wilmington, NC 28403

Area F Yard Improvements
Post-Bid
Wilmington, NC 28401

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Richardson Well Field Access Roads - Repair and Maintenance
Results
Less than $53,325 est. value
Wilmington, NC 28411

Electrical Lineworker Overhead and Underground Training Facility
Alteration
Results
Wilmington, NC

Chair Road Waterline Extension
New Construction
Construction
$500,000 est. value
Castle Hayne, NC 28429

Raleigh Street Self Storage Facility
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Wilmington, NC 28412

Raleigh Street Self Storage Facility
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Wilmington, NC 28412

Parks: Olsen Park Phase 2 - New Hanover County
New Construction, Infrastructure
Conception
$624,380 CJ est. value
Wilmington, NC 28405

Last Updated 08/31/2022 09:06 AM
Project Title

Parkway Hyundai Expansion

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28405   (New Hanover County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 31, 2022 , construction is underway.

Details

,, 27,754 SF - 1 Story Above Grade, 17,256 SF. 1 Story Above Grade, 10,498 SF. 1 Story Above Grade, Demolition, Demolition.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents