Similar Projects
6501 Navigation East End Makers Hub Re-Roof
Post-Bid
Houston, TX 77000

Roof Replacement (Summer 2020)
Post-Bid
Houston, TX 77078

Replacing Roof at Metro`s Field Service Center
Results
Less than $872,431 est. value
Houston, TX 77029

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Replace the Roofs at the Generation One Building
Post-Bid
Houston, TX 77004

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

HPD North Command Roofing Replacement
Post-Bid
Less than $1,500,000 est. value
Houston, TX 77088

Atascocita Middle School Roofing Project
Results
Less than $2,500,000 est. value
Humble, TX 77346

Roofing Envelope Services
Post-Bid

HASC Building Roof Replacement Project at Ellington Airport
Results
Houston, TX 77059

District Wide Roofing and Waterproofing Services
Post-Bid
Humble, TX 77338

Replacement of Existing Roofs at Fulton Village Apartments
Results
Less than $272,260 est. value
Houston, TX 77009

Roofing IDIQ- Plains Area - South
Post-Bid
$2,000 to $3,000,000 est. value

APV Boys and Girls Daycare Reroof
Results
Less than $123,000 est. value
Houston, TX 77057

Community VFD Fire Station Number 3 Roof Replacement
Post-Bid
Alief, TX

Last Updated 09/02/2021 03:23 AM
Project Title

Roof Replacement at Bellerive Senior Living Apartment Complex

Physical Address View project details and contacts
City, State (County) Houston, TX 77036   (Harris County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: A. Remove and properly dispose of existing roofing, insulation, and sheet metal down to the existing concrete deck. B. Remove and reinstall lightning protection system. C. Remove metal edge flashing. D. Remove abandoned equipment, curbs, and/or penetrations and repair the metal roof panel system. E. Install wood nailers at perimeters, curbs, and penetrations. F. Install tapered polyisocyanurate and secondary insulation set in low-rise foam adhesive, and apply a fully adhered reinforced thermoplastic single-ply membrane. G. Install new single ply membrane flashings at penetrations, curbs, perimeter walls, and rise walls. H. Install new sheet metal coping and edge flashings. I. Raise, lower, or modify all utility lines, piping, equipment, or other items which affect the installation of the new roof system. J. Raise all curbs, equipment, etc., as necessary to achieve a minimum flashing height of 8-inches (200mm) above the finished roof.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents