Similar Projects
Grace Street Reconstruction - DPW1 - 2024- City of Platteville
Infrastructure
Conception
$665,000 CJ est. value
Platteville, WI 53818

Grace Street Reconstruction - DPW1 - 2024- City of Platteville
Infrastructure
Conception
$665,000 CJ est. value
Platteville, WI 53818

Badger Hollow II
New Construction, Infrastructure
Design
$195,000,000 CJ est. value
Montfort, WI 53569

Cuba City School District 2022 Bond - Elementary and High School
Addition, Demolition, Renovation, Infrastructure
Design
$36,000,000 CJ est. value
Cuba City, WI 53807

Concrete Foundations
Infrastructure
Bidding
$215,000 CJ est. value
Fennimore, WI 53809

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Resurfacing Project on Rural Ridge Road South of CTH Q
Infrastructure
Post-Bid
$62,000 CJ est. value
Cuba City, WI 53807

Dubuque - Shullsburg, v. Hazel Green n. Limit To Sth 80; Hazel Green - Platteville, e. Jct. Sth 11 To Cuba City s. Limit
Infrastructure
Results
WI

North Bypass and Second Street
Infrastructure
Results
Platteville, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

Ann Street Reconstruction - DPW2-2025- City of Platteville
Infrastructure
Conception
$294,500 CJ est. value
Platteville, WI 53818

Dickeyville - Lancaster Const / Passing Lanes and Slopes / Misc
Infrastructure
Design
$7,000,000 CJ est. value
Lancaster, WI 53813

Last Updated 10/13/2023 08:37 AM
Project Title

Oak Street to Fourth Street Alley and Incubator Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Platteville, WI 53818   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $97,452 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of in- stalling HMA pavement on the alley located between Oak Street and Fourth Street. This Project also con- sists of repaving portions of the Platteville Business Incubator's parking lot as well as miscellaneous park- ing lot repairs. Bids shall be on a unit price basis, with additive alternate bid items as indicated in the Bid Form. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Dan Dreessens, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except those additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities Document notes: Bidding Documents may be obtained online using ebid doc #8648063 upon receipt of a non-refundable deposit of $40.00. Bidding Documents may also be examined at the office of the City of Platteville, at 75 N. Bonson Street, Platteville, Wisconsin 53818, on Mondays through Fridays between the hours of 8:00 a.m. and 4:30 p.m. CST. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all of Contractors obligations under the Contract The Work will be substantially completed on or before November 17, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before December 15, 2023. The Work shall be continuous and uninterrupted.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents