Similar Projects
HVAC Improvements and Upgrades
Post-Bid

Kitchen Hood Cleaning
Term Contract
Post-Bid
Athens, OH 45701

HVAC Maintenance Services
Results

OU Konneker Research Ridges 25 HVAC and Boiler System Upgrades
Results
Athens, OH 45701

HVAC and Mechanical Products
Term Contract
Post-Bid

Campus Steam System Repairs 2020
Results
Less than $525,000 est. value
Athens, OH 45701

Beacon Schools Gym HVAC Renovation
Results
Less than $242,000 est. value
Athens, OH 45701

HVAC Controls Project
Results
Stewart, OH 45778

Washington Hall Make Up Air and Chilled Water
Results
$875,000 est. value
Athens, OH 45701

James Hall HVAC Renovation
Results
Athens, OH 45701

Morton Chilled Water Connection 2019
Results
Less than $410,000 est. value
Athens, OH 45701

HVAC Improvements 2020 Project for Tri-County Career Center
Results
$340,000 est. value
Nelsonville, OH 45764

OU Alden Library Air Handler Replacement Upgrades
Results
Less than $700,000 est. value
Athens, OH 45701

Portable Light Plants and Tow-Behind Air Compressors
Term Contract
Results

Alden Chilled Water Tie-In 2020
Results
Less than $700,000 est. value
Athens, OH 45701

Last Updated 03/19/2020 08:32 AM
Project Title

Gamertsfelder Hall Improvements

Physical Address View project details and contacts
City, State (County) Athens, OH 45701   (Athens County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Contract $6,300,000.00 Alternate 1 (Corridor Carpet) $ 68,800.00 Alternate 2 (Single User Bathrooms) $ 72,000.00 Alternate 3 (Corridor Upgrades) $ 290,000.00 Demolish and or relocate: a. Architectural components including existing casework, doors and hardware, walls, partitions, wall finishes, flooring and ceiling finishes b. Plumbing equipment including toilets, sinks, showers, piping and vents c. Mechanical systems, Hydronic System, Devices and ductwork d. Electrical equipment and devices including outlets, conduits and wire, panels and switches, Fire Alarm System and lighting fixtures e. Abate hazardous materials Construct and/or install: a. Architectural components including partitions, walls, casework, doors and hardware, wall, floor and ceiling finishes. b. Plumbing equipment including toilets, sinks, showers, piping and vents. c. Mechanical systems, Hydronic System, Devices and ductwork d. Electrical equipment and devices including outlets, conduits and wire, panels and switches, Fire Alarm System and lighting fixtures e. Install site utilities

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents