Similar Projects
Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Bridge Rehabilitation With Bridge Deck Overlay, Roadway Lighting, Traffic Signal Improvements, Drainage, Sidewalk Removals on IL 40
Infrastructure
Bidding
$400,000 CJ est. value
Dunlap, IL 61525

Bridge Rehabilitation With Bridge Deck Overlay, Roadway Lighting, Traffic Signal Improvements, Drainage, Sidewalk Removals on IL 40
Infrastructure
Bidding
$400,000 CJ est. value
Dunlap, IL 61525

2021 North Valley Sidewalk Improvements
Alteration
Post-Bid
Peoria, IL

Second Street ADA Sidewalk
Infrastructure
Post-Bid
Chillicothe, IL 61523

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Warehouse Parking Lot Resurfacing
Results
$104,613 est. value
Peoria, IL

Culvert Rehabilitation on US 150
Infrastructure
Bidding
$700,000 CJ est. value
Edwards, IL 61528

Nebraska Corridor Upgrade
Infrastructure
Post-Bid
Peoria, IL

Replace Refueler Parking Area - General
Infrastructure
Results
Less than $700,000 est. value
Peoria, IL 61607

Sidewalk Participation Program 2021
Infrastructure
Post-Bid
Peoria, IL

North Second Street and North Third Street Sidewalk Improvements
Infrastructure
Results
$131,841 est. value
Dunlap, IL 61525

Riverfront Curb Improvement
Infrastructure
Post-Bid
Chillicothe, IL

Sidewalks in Need of Repair (SINR) Program
Infrastructure
Results
Peoria, IL

Last Updated 11/10/2022 05:33 PM
Project Title

Bus Stop Improvements

Physical Address View project details and contacts
City, State (County) Peoria, IL 61603   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $39,882 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Greater Peoria Mass Transit District (GPMTD) is seeking bids from qualified, responsive and responsible vendors to provide bus stop improvements. The scope of work/specifications is outlined in the Invitation for Bids (IFB). The successful Proposer shall meet the terms and conditions set forth in this document and all other attachments. All questions should be directed to: Jamie Arbogast, Procurement Greater Peoria Mass Transit District 2105 NE Jefferson Avenue Peoria, IL 61603 (309) 679-8155 E-mail: jarbogast@ridecitylink.org The right is reserved to accept any proposal/bid or any part or parts thereof or to reject any and all proposals/bids. Acceptance of any proposal/bid is subject to concurrence by the Illinois Department of Transportation and the United States Department of Transportation. Any contract resulting from these bids is subject to financial assistance contract between the GPMTD and the United States Department of Transportation and the Illinois Department of Transportation. Contractor will be required to comply with all applicable Equal Employment Opportunity laws and regulations. Funding provided in whole or in part by the Illinois Department of Transportation IDOT.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents